The floor joists and the purlins will all be 4"x6" oak. One of the features I want to incorporate is an arc from the tenon into and toward the bottom of the joist/purlin. It will provide a nice aesthetic touch and should help mitigate some of the potential weakening caused by checking as the wood dries. As I considered my intentions, it became clear that I didn't have the right tools for this job. It seemed that a band saw would be a good choice, but a stationary one would present some challenges when working with 12 foot long pieces of oak that weigh 100 pounds or more (depending on how much they've dried while in storage).
Several companies make a portable band saw. Generally, these are used for cutting metal. Apparently, they do a pretty good job of that when equipped with the right band saw blade. I thought that if I had the right blade, this would be a good tool for my purposes. So, I searched on Ebay for one. I didn't want to spend the $260 or more that a new one costs. I eventually won an auction for a used Porter Cable portable band saw. I ordered some 6 tooth per inch blades from MK Morse. After receiving the saw and the blades, I had to try it out.I marked the dovetail and a shallow arc on the end of a short piece of 4"x6" oak that I had in the shop. I then tried to cut it out. When I was done, there was a dove tail tenon on the end of the timber, but the cuts were a bit crooked and wavy. I marked the other end and tried again. Then, I chopped off the first end and tried a third time. By paying careful attention to the orientation of the saw and making sure I stay on the lines on both sides, I was able to cut out a decent dove tail tenon. I'll practice a bit more before I begin on the 100 joists and purlins that I'll need for the frame. But, at least it looks like my idea will work.
