Introduction

The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.
Showing posts with label windows. Show all posts
Showing posts with label windows. Show all posts

Friday, June 1, 2012

Window seats upstairs

A while ago I finished curving the straw bales around all of the windows downstairs and installing 3/4 plywood window sills. Upstairs, I hadn’t gotten all of the window sills/seats put in and had one windows to curve the bales on either side. I got those done today.

After finishing packing slip straw in all the walls, some of the plywood I had been using for forms was now available. I just had to rip the pieces to the proper width and cut them to the right length so that I could install them. There was only one window that needed the bales curved, the one on the west end upstairs.

It looks good to have the windows finished. I still need to do above them, but that will entail putting in some nice boards rather than rounding bales like I did downstairs. I’ll do that later.

001004006

Wednesday, August 3, 2011

“Well, it’s about time!” An update…

It seems like it’s been a long time since I’ve posted to my blog. Probably, because it has been a long time – over 2 months. I’ve not been doing nothing, just not blogging.

I’ve had a lot of different things vying for my time, as is usual for the summer months. Last year I put off a lot of things and worked on the house full time, but I’ve not been able to do that this year. So, I’ve not gotten as much done as I would like.

In this post I’ll try to provide an update on some of the things I have done since the last time I posted (was it really in May?).

We haven’t gotten any more interior walls packed with slip straw. I’d say we have about 65% of them left to do. All of the downstairs windows, 019except the bathroom windows, are bull-nosed now. I have to build the window sills/seats for the kitchen windows and the laundry room windows (and the bathroom windows). 015Then, the five upstairs windows need to be bull-nosed and the window sills installed. I was able to round the bale edges around the front door and on one side of the back door. 018

After purchasing materials to build a masonry chimney, I poured a footer for it. Then, I used concrete blocks to bring the base up to the level of the floor where I’ll be building the chimney. A friend will come over to help me with laying the brick for this project. He’s working on a job that will keep him busy for another week or two, which is fine because I haven’t gotten to the point of being ready to build the chimney yet anyway.

I did begin to plaster the wall behind the location of the chimney. I figured it would be easier to get the plastering done before the chimney is there in the way. 041I’ve only got the first coat on art of the wall so far. I attached some drywall at the top of the bales along this wall (the front wall) to close up a gap between the top course of bales and the beam running across the top of the wall. There was no way to effectively stuff it with straw. I’ll plaster over the drywall pieces later. 038So, they will disappear.

Once I got my hands in the mud, I had to plaster more than just this section of wall. So, I put the first coat of plaster on the slip straw wall in the living room. This wall is between the living room and the master bedroom. After I get the finish coat clay (which I ordered today), I’ll try a batch on this wall to see if it will be enough to finish it, or if I need to put another thin layer on the first coat before the finish coat.

Last week I went ahead and made arrangements for getting two more important jobs done. One of those is installing the cistern, and the other one is having the insulation blown in. I hired a local individual to come dig out the area where we are going to set three 1,500 gallon septic tanks for our cistern. I’ll plumb them together as one tank, and we’ll harvest rain water off of the roof to fill them. I also hope to develop a spring later on for filling the cistern. 046It didn’t take too long to dig into the hill in front of the house where the tanks will be set. I’ll post more on this process later.

Originally, for the insulation above the cathedral ceiling in the house, a friend of mine was going to bring his machine and dense pack cellulose. I took longer than expected in getting things ready for the insulation, and in the meantime he sold his machine. So, I hired an insulation contractor to insulate my roof. They blew in fiberglass in the space I constructed. They also insulated the kitchen, mud room,  laundry room, and guest room (used to be sewing/study) roofs. 042It actually didn’t cost much more than I expected to pay for having my friend do the job.

In preparation for the insulation, I had a few tasks to complete. I blocked in along the front outside wall where there were some gaps into the insulation space. I also blocked in some gaps on the back. I cut the chimney opening in the ceiling and framed it in (I figured it would be easier to do that now than after the insulation was blown in). I also stuffed straw above the kitchen and laundry room windows 052which I hadn’t done previously. I also stuffed straw above the top course of bales to bring the walls up to the ceiling level.

On the day scheduled for the job, yesterday, I removed some metal from the back of the house and cut holes in the sheeting to allow access for blowing in the insulation. It worked great. After they were done, I closed the holes back up and put the metal back on.

Inside, they stapled netting on the ceiling across the rafters and blew the insulation inside that. 048The R-values are 39 for the main ceiling and 28 for the other areas. I think they will effectively be a little higher than that.

There are a lot of things yet to be done before we will move in. One thing I’ve learned through building this house is that my plans and timetables don’t always work out as I imagine they will. I’m okay with that.

Thursday, May 5, 2011

Window sills and curving bale corners

I’ve considered different options for the window sills in the house. One of the earlier ideas was to set stones in concrete – done right, this makes a very nice window sill/seat. Later, I decided to make them with wood, and I’ve been pondering upon how to build them.

On the first day of this week, I planed some poplar boards with the intention of using them for the window sills. Dad and I tried out the tongue and groove router bits I recently purchased on a couple of the boards. My idea was to put in a framework using 2x2s that the poplar boards would be nailed in to. As we routed out a couple tongues and grooves, I continued thinking about my method. As a result, I changed my plan for what to do.

I decided to use some 3/4” plywood as a sort of sub-sill and install finished boards later, probably using the same material as what I will use on the floor in the house. The plywood will give me a solid foundation to nail the finish boards to, and it actually will install more easily than the previous method I had in mind.

Wanting to try it out, I decided to start in the master bedroom. The first task was to shape the corners of the bales on the sides and above the window. I used my electric chain saw to knock off the corner of the bales on both sides and to cut 3/4” out 050of the top of the bales below the window (to set the plywood at the right height).

Once I had the sides curved and the bales above shaped (I describe the basic process below), I cut plywood to install for the sill. I attached it below the window to some thin strips of wood I nailed to the framing below the window, setting the top of the plywood even with the top of the 2x4 at the bottom of the window. The finished boards will will butt up against the window on top of the 2x4 framing the bottom of the window opening. I also set some 2x2s flush with the exterior surface of the bales below the sill to provide extra support. 006It turned out well. The photo of the window also shows one end of the opening for the sliding glass door which I also shaped.

Today, I worked on the living room windows. Looking into the corner, you can see how they looked before I started. Although we tried to stack them straight, he ends of the bales were uneven. It’s quite easy to remove straw from the ends of the bales in order to make them more even.

The first step in shaping the bales around the windows was to cut the corners off. My electric chainsaw worked well for this. 013I found that it wasn’t necessary to try to round the corners.

The next step was to cut a length of poultry netting/chicken wire to fit the height of the window. I stapled one edge into the 2x4 framing on the side of the window. Then, I stuffed straw into the gaps between bales and added straw where the 014bale ends needed built out a bit. The chicken wire serves to hold the straw against the bales and to form the desired curve.

I pulled the chicken wire around the curve and anchored it to the bale wall with a short stick behind one of the hard wood sapling pins in the wall. I worked from bottom to top, pulling the wire tight, anchoring it, 016stuffing straw where needed, pulling the wire tight, adding another anchor, etc. 017When I reached the top, the corner was rounded, and the wire was tight.

The final step was to staple the wire securely to the pin in the wall. With it stapled, I removed the anchor sticks and was ready for the other side.

When we stacked the bales, we laid a 2x6 across the window opening and secured it to the framework above so it wouldn’t sag. Then, the next course of bales was added on top of the 2x6. I needed to not only curve this edge above the windows, but I also needed to provide a 019surface for the plaster to adhere to later.

Again, I knocked the corner of the bales off with the chainsaw and then attached chicken wire to the top 2x4 of the window framing. I put loose straw on the wire and stuffed it into some voids. Then, I pulled it up tight to the bales above the window, pounding it into the curve in order to shape it how I wanted it. A 2x4 of the bale shelf is exposed one bale course above the window, and I stapled the wire to this. I completed this process in sections across the window.

With both of the double sets of windows in the living room shaped, it was time to install the plywood for the window sill. While I was cutting off the corners earlier, I also cut the height of the bales below the window a little. The first step in doing that was to cut the strings of the bales (to keep the strings from getting tangled in the saw). Since the bales were already securely in the wall, 031they weren’t going to go anywhere or fall apart with their strings cut.

I nailed a strip under the windows to attach that edge to and then laid the pieces of plywood I cut in place. With them nailed under the window, I attached some vertical pieces flush with the bale surface under the plywood. I used some pieces of oak that was close to 2”x2” which I had.

The plywood extends past the inside plane of the bales because I want the plaster to come up under it rather than in front of it. The plaster will actually help provide additional support for the sill. It should be solid since it’s attached front and back and rests on top of the straw bales.

 

042

Friday, November 5, 2010

Beginning the siding

Before too long, we ought to be able to get the plastic off of the house.

I spent some time on Tuesday fixing the small window that goes above the wood stove. It had a crack in one pane which had allowed some moisture to get between the panes and leave some water deposits. I wasn’t able to purchase I piece of glass locally large enough to replace the one pane, but I had some window glass that was of sufficient size if I could cut it. So, I read about cutting glass and watched a few videos online.

Thankfully, I had more than one piece of glass to work with. I practiced on one and then attempted to cut the real thing. The first one turned out acceptable, although there were a few rough edges. So, I cut another one that turned out a little better. When fixing the window, I ended up using both of the ones that I cut since I couldn’t clean the one remaining pane in the window.

Anyway, it took me most of the morning to get the window repaired and put in the wall.

After finishing the window, I started putting on the flashing where the upstairs walls meet the porch roof. I previously bought a couple rolls of 24” aluminum flashing for this purpose. One of the rolls was long enough to reach from one corner to the other across the back of the house. The other roll was long enough for both ends except for about 5 feet. I had to use some other flashing material there.

On Wednesday, it rained all day. It was just a light, drizzly kind of rain. I put up the tarp on the back of the house upstairs because when the water dripped off of the upper roof, it was splattering on the wall. Since there was no wind with the rain, the other upstairs walls didn’t get wet.

Yesterday, I finished the flashing on one side and started installing the siding. I attached the first piece by myself and then realized that I would need some help to do the rest of them. Twelve foot pieces of Hardiplank siding are west endsomewhat unwieldy. Thankfully, my dad was available to help me in the afternoon.

We worked on the west wall and were able to get the siding to above the window. There was a fair bit of cutting involved to match the roof line and to fit around the window. Also, since I hadn’t initially planned on using this type of siding, I didn’t have the vertical stringers optimally spaced for installing it. That means that there is a little more waste at times in order to make sure that the ends are on one of the stringers so they can be nailed securely.

This morning, even though it was chilly and spit a little bit of rain at times, we were able to get the east wall up to the same height as the west wall. back wallAfter lunch, we worked on the back wall. We didn’t finish it, but we got a good start and should be able to finish it and the other two walls on Sunday.

When I bought the siding, one bundle, enough to do the upstairs based upon my hasty calculations, was a 6 inch exposure while the rest was a 7 inch exposure. I figured that this would work well. If I don’t have enough to finish all of the upstairs walls with the 6 inch, I can finish it off with some of the 7 inch near the top. We didn’t continue above the windows on the either end to ensure we had enough to get the siding up most or all of the way on the back.

Monday, November 1, 2010

Upstairs plaster and windows

We had a few friends make it yesterday to help with the second coat of plaster. The objective for the day, which we achieved, was to finish the second story walls. We had six people applying plaster and two more mixing and delivering the plaster to the other workers. Everything went very smoothly, and I am very pleased. I can’t express how grateful I am to all of the wonderful people who have given of their labor to help out on our house project.

There is only one small section on the front kitchen wall that still needs the second coat of plaster, maybe four square feet. I should be able to apply that tomorrow.

After we finished the plastering yesterday, I recruited some help to move the sliding glass door from the barn to the house. It’s been stored in the barn for the last three years. It’s an eight foot wide door, and it’s quite heavy. windows and door on east side of houseSo, it was really nice to have some help moving it. I’m not sure that Dad, Danny, and I could have moved it successfully by ourselves.

This morning after I went into town to run a few errands, Dad and I set it in place in the house.  It’s on the east side of the house leading from what will be the master bedroom onto the porch. Thankfully, the door fit in the framed opening with little difficulty. We spent a little time cleaning it after installing it.

After lunch, Danny helped us move the remaining five windows from the barn, clean them, and install them upstairs. Cleaning the nearly five years of accumulated dirt off of the windows took longer than it did to carry them up ladders and install them.

upstairs windows on back of house west side

So, we now have all of the windows and doors put in except for the small windows that will be above the wood cook stove – I have to cut and put in a new piece of glass. Hopefully, I can do that tomorrow. We also will swap out the kitchen windows with new casement windows when they arrive, which should be by this coming weekend.

We should be able to start installing siding this week. It looks like we’re on schedule to have the house closed in by the end of next week. That’s my goal, anyway.

Saturday, October 30, 2010

More second coat of plaster & more windows

The house on 10/30/2010We had some rain early this week. I thought that might slow down work on the house, but we were able to still get things done.

Dad and I worked on the second coat of plaster on the walls under the porch roof – the south, east, and north walls. In two days’ work, we were able to get all the way around except for two small sections above the back door which I’ll finish later. surface of 2nd coat of plaster We ran out of plaster at the end of the day, otherwise these sections would be completed, too.

Working on the second coat on the exterior, I’ve learned a few things which will help when the time comes to plaster the interior. On the inside, I want a nice, fairly smooth and even wall surface. One of the things that I’ve learned is to be sure to prep the wall adequately, filling in voids and generally making the surface to be plastered as smooth and straight as possible.

On the outside there are places in the first coat of plaster which are higher and lower than other sections. The low spots need extra plaster to fill them and the high spots require a greater thickness of plaster over the wall to achieve a smooth, flat surface. On the exterior, since it will have siding, it’s not important to completely smooth out the wall. So, we’ve not endeavored to achieve the same sort of surface which I desire for the inside.

Another lesson I’ve learned is to make sure the plaster mix only has the amount of clay that is needed. An excessive amount of clay in the plaster causes it to crack while it dries since clay shrinks as it dries. front living room windowsIt is amazing how hard the plaster gets when it dries even when it is mixed with only 28% to 30% clay content.

Since we pretty much finished the second coat of plaster downstairs, we went ahead and installed some windows and doors yesterday. We put in the front door, the back door, the living room windows, the master bedroom window, and the two bathroom windows. These went in very well, the biggest time consuming part being cleaning the almost five years of accumulated dust and dirt off of large windows.

east wall of windowswindows and door on back of house

We were going to install the small windows that will go above the wood stove, but it has one pane of glass that is cracked which allowed some dirt to get between the panes. We’ve taken the window apart, and I will install a new pane of glass and clean the inside surface of the other pane. Then, I’ll be able to put this window in.

We also didn’t install the large sliding glass door that goes in Anne’s and my bedroom. We’ll do that later. There’s no rush.

We ought to be able to plaster the exterior upstairs walls early this coming week. I’m expecting a few people to come over tomorrow to help with the second coat. Once we have it completed, I’ll install the upstairs windows, at which time they will all be in. Then, there are a few small tasks to complete before starting on the siding.

Inside the living room

Saturday, October 23, 2010

Windows, the first ones installed

the house

Every step of the process is exciting as we watch the house come together. I’ve devoted a lot of time so far this year working on the house, and there are a lot of hours of work yet to come. It’s a long, arduous process, but we are getting there little by little.

Yesterday, we had another milestone on the project as we began installing windows and doors. Previously this week, we put the second coat of plaster on about 100 feet of wall. One of the casement windowsThis brought us to the point of being able to put in some windows and doors in preparation for siding these walls.

It was a little over four and half years ago that I purchased 15 large casement windows off of Ebay and traveled to Flushing, Michigan, to pick them up. They’ve been stored in the barn since then. Dad and I brought five of them to the house yesterday to clean off the accumulated dust and dirt and to begin setting them into the openings for them on window from the insidethe house.

I am very pleased with the quality of these windows. They are well made, opening, closing, and locking very nicely. They are also beautiful. They lend a certain elegance to the house, I think. Anne is also pleased with them.

As casement windows, they crank open. There are two 27” windows on each unit. When opened, unlike double-hung windows which only open half (at the most) of the window, these windows open the entire area, providing great ventilation. We are going to really appreciate them.

the kitchen windows -- to be replacedWe also put in the kitchen windows, but I’m going to take them back out. They just are not of a good enough quality. Additionally, since they are double-hung, it will be difficult to open and close them, because it will require reaching over 24” of counter and 18” of window sill. Not an easy thing to do. So, I’m going to get some casement windows for the kitchen, too. Hopefully, I will be able to find some whose quality will be acceptable. The others will be saved for a later building project.

The windows certainly change the look of the house.

We also installed two doors. On Thursday, I purchased two more exterior doors which I needed. I got them from the local guy who had just gotten a trailer load of doors and windows, among which mudroom door and dining area windowwere the two 15-light 36” exterior doors I wanted. We put in one of these yesterday and another full-light door I purchased previously.

One of the doors presented a challenge because it was 1/2 inch taller than standard, meaning the opening I framed was not high enough. We were able to make some modifications which allowed the door to fit in the opening.

We’re all excited and look forward to continued progress on the house.

Tuesday, October 12, 2010

Upstairs bale walls

Today, I didn’t work much on the house. I put some plastic up to protect the bales that were exposed. Just as I was finishing, it began to sprinkle. It didn’t amount to much, but it was good to get them covered. Tomorrow, I hope we can get all of the walls pinned. The idea is to have them ready to be plastered during the mud party on Sunday.

I took a few photos of what we accomplished yesterday so that I could share them. It’s really neat to see the house with the walls stacked.

northwest corner

The stairs will come up near where the ladder is in the next photo. There is a small landing at the top of the stairs between the two upstairs bedrooms. We’re planning a cozy, little reading area by the window on the landing. 

Looking across to the west bedroom, there will be a wall between the two posts making a storage area under the eaves. There will also be a wall on the near side of the room where the ladder is leaning.

Looking toward the east bedroom, you can see that the windows on the back of the house are set quite low. They are one bale height above the floor which will make them really cozy with the built in window seat. There will be closets on either side of the back window in each bedroom, making the window feel more like a dormer.

The west window in the west bedroom. All of the large windows in the house, like this one, will have wood sills making comfortable window seats. You can imagine how nice it would be to sit in the window with a good book on a sunny winter day.

Thursday, October 7, 2010

More progress and a work party (ya’ll come)

We are keeping at it and making progress!

I decided to invite friends and acquaintances over for a work party on October 17, 2010. If you’re interested, let me know.

The plan for the work party day is to get as much mud on the bales as possible. In preparation, I’m planning on getting all the bales stacked, one of the living room windowspinned, and ready for plastering before October 17.

Yesterday, we stacked the rest of the bales downstairs (well, except for one above a door). There weren’t a great number of bales because of the many window openings, but it required a bit of retying which takes time. Also, the last course downstairs must be wedged in between the previous course and the bale plate which requires a little effort and some persuasion with the large mallet.

back wallnortheast corner

While Dad and I stacked bales, Danny and Jon plastered the kitchen walls. plaster on front kitchen wallThey did have some help from my younguns for a while. They weren’t able to finish the front wall, but they got a good start.

I’ll be sorting out good bales from those stored in the barn for the upstairs walls. So far we’ve used about 280 of the 300 bales I bought for the downstairs walls. I’m not sure how many bales the upstairs will take, but I guess about 150.

So, we have a lot to get done this next week. Today and tomorrow, Dad, Danny, and I are going to cut the winter’s supply of firewood. I’ll get back to the house at the beginning of next week.

northeast corner from outside  front of house