The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.
Showing posts with label root cellar. Show all posts
Showing posts with label root cellar. Show all posts

Wednesday, February 9, 2011

How to build stairs (to the root cellar)

Although I haven’t gotten any more 2x4s yet, I had just enough left to frame the root cellar walls. I’d set some treated 2x4s aside for this purpose, otherwise I’m sure I would’ve used them elsewhere in the house.

Before framing the cellar walls, I cut the stringers for the stairs into the root cellar. I thought it might be helpful to someone if 008I shared the process I used for building the stairs. This is the same method I used for the main stairs in the house (photo at the right).

The first thing to do is to figure out the total rise and run for the stairs. For the root cellar, the distance from the concrete floor to the floor above (the first floor of the house in this case) is 90 inches. The root cellar is 96 inches across, but there was extra space above the inner wall of the root cellar, about 12” long and 9 inches to the sill board on the block wall. I wanted to use this for a step, thereby shortening the total length of the stairs. With the total rise and run, I could figure the specific measurement for each step.

The main stairs I built have a 7-1/4” rise and 11” run, which make very comfortable stairs. I knew that I couldn’t build the root cellar stairs to the dimensions. I did not want steps that are too steep – I’ll be using them to haul vegetables/food in and out of the root cellar. I’ve been on some too steep, too narrow, feel-like-you’re-gonna-fall steps before, and I knew I didn’t want that.

I figured if I made the steps have a rise of nine inches, meaning there would be a step up of nine inches for each step, that would come out even (9” x 10 = 90”). In order to figure the run for each step, I computed the total length of the stairs for three different lengths: 9”, 10”, and 11”. With the extra space for a step outside of the root cellar at the top and having a small platform for the bottom step instead of going all the way to the floor, I decided on a 10 inch run for each step. That would be enough space for a foot to comfortably fit.

It was easy to figure the total number of steps I would have to cut into the stringers. The first step would be outside of the root cellar. So the second step would be the first one on the stringers and would be 18 inches below the first floor level, and the stringer would have eight steps (of the ten steps needed, the first one was outside the cellar and the last one was the cellar floor).

The only other consideration was the thickness of the treads and risers. I was using 2x material which is 1.5” thick. 002That means for the bottom step, I had to subtract 1.5 inches for the rise to be 9 inches when the tread was put on. And, since I was going to use the cellar wall for the riser on the top step against the wall, I would need to cut it 1.5 inches shorter than the others.

With my figures, I began to lay out the steps. I used a framing square (a handy tool) on which 005I clearly marked with pencil the 9” and 10” lines on both sides along the outside edges. By positioning the square on the 2x12 which was to become the stringer with the 9” and 10” marks on the edge, I used a pencil to mark the first step. After the first step, I moved the square so that the 9” mark was at the point where the 10” mark had been which moved the 10” mark further down the edge of the board. 008I drew the shape and then continued for the rest of the steps.

Once the lines were all drawn using the square, I measured the height for the bottom step and the length for the top step (you can keep the height and lengths of the steps straight with the measurements you’ve now transferred to the board – 9 inches and 10 inches). With everything marked, I could begin cutting.

I used my circular saw to cut along the lines, watching carefully so that I didn’t cut beyond the corner – 013a round blade will only cut all the way to the corner on the top side. So, once I cut all of them with the circular saw, I finished the cuts with a hand saw. 014If there was any unevenness left in the cuts, I cleaned it up with a chisel.

Now, I had my first stringer. I could mark the second one the same way, but I opted to use the first one as the template for the second one. I laid it on top, keeping the edges aligned, and marked the treads onto the other 2x12. Then, I cut it the same way as the first one.

The only other materials necessary for the steps were the treads and risers. I had a 2x10 which I cut into 30” lengths for the risers (30” is the width I’d previously decided on for the stairs when framing the floor above the root cellar). They were about 1/4” too wide, so I ripped off the extra on the table saw. For the treads, I used 30” lengths of 2x12s. I did not rip their 11.25” width, leaving 1.25” to hang over on each step.

Before I put the stairs in, I built two short walls to go on either side of the stairs in the root cellar. I nailed them together in the house and then lowered them down into the root cellar. 023I convinced them into position (they fit snugly) and secured them with nails into the floor joists at the top and concrete screws into the floor and wall of the root cellar.

With the walls in place, I situated the stringers and nailed them to the wall studs. Then, it was a matter of nailing on the risers and the treads. I had to figure out and build the top step on its own (no riser) and extend the bottom step for a short platform.

The length of the walls provides for 30 inch openings at either side of the steps at the bottom. The right section of the root cellar will be the larger of the two rooms. We haven’t decided exactly how we will store things, but given time we will. If the smaller room on the left can be kept a little warmer, it would be a nice place for storing sweet potatoes, onions, garlic, winter squash – the things that like it a little bit warmer and not too damp.

019030

Wednesday, July 14, 2010

More vertical stringers

Jon and I started in on the west side of the house today. After moving the materials and tools we needed, ripping a few more 2x8s into 2x4s, and laying out the positions for the stringers, they installed quite well. west side stringersSo, the majority of the stringers are in around the timber frame. The ones that remain are shorter ones that will be below and above the window/door bucks.

After finishing the west side stringers, we took a little time to do some figuring on the pitch for the porch roof (also the pitch for the roof over the kitchen, summer kitchen, mudroom, back wall above root cellarutility room, and sewing room/study area). I don’t want the outside wall of these rooms and the outside of the porch too low. We set up a board so we could visualize the pitch and take some accurate measurements.

With this figuring done, we moved our efforts to the wall on the outside edge above the root cellar, walls for the sewing room/study and utility room. back wall and raftersThere will be one large window in each of these rooms.

We put up a header on the vertical stringers for attaching rafters to the house. We then nailed 2x4s cut to the right height along the back wall, leaving openings for the window bucks. It is exactly 24 feet from one corner of this wall to the other. another viewSo, we were able to use one 2x4 (cut from a 24’ 2x8) as the header at the top of the wall. This provides the plate for the 2x6 rafters to sit on.

After getting the corners of the wall plumb, we nailed on the header. Then, we plumbed each of the verticals and nailed them on. back wall and raftersNext, we put on some rafters in order to tie the wall into the house.

We’ll continue where we left off on Friday. Hopefully, we finish the west wall on this part of the house and put up the vertical stringers on the front of the kitchen. Maybe we’ll even get other stuff done.

    the house from a distance

Friday, June 25, 2010

More floor framing

(This post was written yesterday, but Blogger/Picassa were having problems and prevented me from posting it last evening.)

Although the weather has been hot and humid, we keep working. And, we’re making progress.

On Wednesday, Jon had to leave early because he was needed at home. I had to run an errand into town which took longer than it was supposed to. After I returned, my dad offered to help me work on the house. continued framing -- three sectionsWe worked a little before lunch and then another couple of hours after lunch and accomplished a fair bit.

We continued framing the floor on the west side of the house, working out from the root cellar. I had to figure how to go about it since I only had enough 2x8s to use as floor joists for one section. There are three sections from framing for the floor above the root cellar toward the front of the house: the mudroom, porch, and the summer kitchen.

summer kitchen floor framing I decided to use the 2x8s for the floor joists of the summer kitchen (that’s what was left of the 2x dimensional lumber I bought at the beginning of the week). They were mostly 10’ long boards, and the span is approximately 9 feet. So, these worked well. They wouldn’t work in the mudroom section since the span there is 11 feet.

We started by putting beams from the mudroom foundation wall to the piers on this end of the house (two piers). Because of how the floor will be framed, I chose to use 6x8 beams between the piers. We ran a 6x8 beams from the first pier back to the foundation wall in order to ensure that the two longer beams I had would be long enough.

I designed the piers to be about 2 inches higher in elevation than the foundation wall. southwest corner of the houseThere is some variation to be handled with wood shims. However, when we laid the first beam from the corner of the mudroom foundation wall to the first pier, the level showed that it was level. The next beam between the two piers was low at the corner. Then, the 4x6 from the kitchen foundation to the pier showed the pier being high. This was confusing.

We checked things with a line level, but it just wasn’t accurate enough to determine how level the beams were. So, I used a straight cedar 2x4 I had with the four foot level on top. With this setup we were able to determine that the first pier was 1.75 inches higher than the foundation wall – more like it was supposed to be. So, I notched the bottoms of the beams, and amazingly, they came out level (the crown in the first beam accounts for most of the discrepancy that exists).

We worked the beams out to level before hanging floor joists for the summer kitchen. These went fairly quickly. They hung on the 2x10 box on the kitchen foundation wall on the inside and nailed into the 6x8 on the outside.

After framing this section, we hung two 6x8 beams from the house out to the outside edge. We’ll hang 2x6 floor joists out from these beams to the 2x10 on the edge of the floor above the root cellar, to the box on the mudroom foundation wall, and to the 6x8 at the edge of the summer kitchen floor framing (four sections of 2x6 floor joists all together). These 2x6 floor joists will only span 5.5 to 6 feet. So, they ought to be strong enough.

At this point, it was 5:00pm and we were at a good stopping point. Jon will probably be here to work tomorrow. We’ll continue with more floor framing then.

 

  

Wednesday, June 16, 2010

Sill plates

On Monday, Jon and I coated the kitchen crawl space wall with surface bonding cement. We also coated the small section inside the root cellar that I didn’t take care of last summer. I also finished stuccoing the piers for the porch at the back of the house. We had these jobs finished by lunchtime. So after lunch, we started milling boards for the sill plates. That didn’t go so well because my Husqvarna 3120xp chainsaw (the powerhead for the sawmill) wasn’t running properly. After milling one log, we completed a couple of other jobs unrelated to the house.

This morning, we returned to milling. I checked out the saw yesterday in preparation, cleaning the air filter, fuel filter, and muffler. It ran better, but still doesn’t have the power it should. I believe the fuel filter is the culprit. I’ll be ordering a new one.sill plates at corner of root cellar

After we had several of the boards milled, we hauled them to the house to begin bolting them to the foundation and to see what we still needed to mill. There are four different thicknesses which we’re milling. All of the sill plates are cedar.

aluminum flashingWe put down aluminum flashing on top of the block wall and then bolt the cedar board on top of that. We were able to complete the sill plates around the root cellar and on the west side of the house. We put flashing across the front before we had to quit today. We’ll work on it again Friday.root cellar with sill plate installed

 

 

 

  west side of the house

Thursday, June 18, 2009

Blocking in the crawl space

We’ve had plenty of rain so far this year. The garden has not suffered from dryness. In between rain showers and storms and all the other work there is to be done around here, I have continued to work on the house. I laid out blocks on the footer last week, figuring where the crawlspace walls need to be in relation the house frame.

011Earlier this week, after some rain and before some other rain, I started mortaring the first course of blocks on the west side of the house for the wall that will be under the mudroom. The first step in the process was to remove some of the accumulated mud that had been deposited around the blocks by the rain. Then, I lifted out the block that was to be mortared into place, and placed some mortar where the block had been.

012After distributing the mortar where the bottom edge of the block would set on it, I placed the block back into position. The main purpose for the mortar is to get the first course of blocks level. So, after placing the block on the mortar, I used a piece of wood to get it into place and then checked its placement with a level. I endeavored to make sure that each block was level side-to-side and along the line with the other blocks.

016015

It takes a while to mortar the first course of blocks into place. I was able to complete the ones on the level that will be beneath the mudroom.  It then rained off and on during the next couple of days, and I managed to work on some other things that needed done.

018

I was able to return to the project yesterday afternoon after spending the morning working on my class (I teach a class online for a university). I started by mortaring the blocks along the next level of the footer on the west side of the house. This is a shorter run than the previous level, and it went fairly quickly.

After getting these blocks mortared into level, I began laying blocks. One thing about dry stack concrete block construction is that the block-laying goes quickly. I had to haul the blocks from where I had the block company put them a few weeks ago which is maybe 20 yards away and down hill from the house. I moved six at a time using a wheel barrow. That seemed to work better than using a hand truck.

I began laying blocks for the walls under the mudroom since that mortar was fully set up and cured. After completing laying those, I went ahead and laid the ones on the section I had just mortared. I figured that the mortar wasn’t going to settle or move with the weight of the blocks anyway.

Because of the way I designed and poured the footer, there are four levels for the blocks around the house. I did not worry about making the steps for each level perfect with the other levels so that the blocks could 026be laid seamlessly all the way around the house. Each level can be constructed as a separate wall. Any gaps that may exist between levels will be filled with concrete. Then, the whole thing will be coated with surface bonding cement. I will cut cedars for the sill on top of the wall, so any variation in height will be accounted for in the dimensions to which I cut them. This simplified the figuring and block laying for me.

I saw a block wall a couple days ago for which the footer appeared to have been poured on an angle matching the slope of the house site. The blocks appeared to have been cut along the bottom so that the top would be level. I didn’t want to do that much cutting. I think my method will work all right.

025In anticipation of plumbing that I’ll do later, I cut a hole in one block before laying it. This hole will allow me to run the sewer pipe to the septic tank through the wall. I am not completely sure where the septic tank will go at this point. So, I’ll cut another hole on the opposite side of the house, too, just in case I need to place it on that side. I knew I didn’t want to cut a hole later.

022As can be seen in the photo to the left, I didn’t lay out the end wall on the cellar exactly right. It doesn’t line up straight with the crawlspace wall I just laid. I can’t change it, of course, and it really won’t create much problem. I expect that it won’t be very noticeable later anyway.

A thunder storm rolled through just after I started writing this post. I was planning on working on the front crawlspace wall this afternoon. It may be too muddy now. I’ll see in a little while.

 

      021  024033

Thursday, May 14, 2009

Backfilling around the root cellar

I worked on the interior walls earlier in the week, getting three of them coated with the surface bonding cement – all but the long wall on the house side. So, yesterday, I began the process of backfilling against the walls of the cellar. It was nice to have the backhoe to use; it would’ve been overwhelming to do this job with a shovel.

I situated the backhoe behind the house near the corner of the root cellar and began moving dirt from the pile on the hill. This went fairly well. I could reach about 16 or so across the back edge. There was one problem: a few jerks with the hoe caused the bucket to slide over against one house post. I didn’t like that, of course. Initially, it wasn’t clear to me how to get it away from the house. I couldn’t back up because one rear tire was on the edge of the hole. I was able to move it without causing any damage to the house.

I was able to position the backhoe at a few different locations on either end of the cellar and put fill dirt in around almost all of the walls. I took it easy, knowing I didn’t want to knock into and mess up the walls.

On the house side of the cellar, there was about 14 feet of wall which the backhoe couldn’t reach because of the house frame. I had to use a shovel. Thankfully, the area to be filled here wasn’t to wide and didn’t need to be filled to the top of the blocks.

Here are a few photos taken after I finished today (the pvc on either end is for air vents):

house side root cellar root cellar looking down the back wall

Monday, May 11, 2009

Root cellar: surface bonding cement

We’ve had more than five inches of rain during the last nine days. In between some of the showers and storm, I’ve been able to work some on the root cellar. The frequent rain has been frustrating in that it’s kept me from getting things done like I want to, but that’s the way it goes.

The blocks are all stacked for the walls. I was able to fill 12 cores in the walls last week when we had a mostly rain-free day. I filled six more cores yesterday, all that will be filled. Last Thursday I was able to apply the surface bonding cement to the outside wall toward the hill on the back of the root cellar. That night we received some very heavy rain (over an inch and a half of it) which caused some mud to break free on the back wall of the excavation. Not too much, but I was glad to have the wall done on that side.

Today, I installed the PVC through the end walls to which I will connect the fresh-air vents for the cellar. I used concrete and mortar tooutside walls are done fix them in the wall and cover the holes around the edges.

Then, I finished parging the rest of the outside walls. It was muddy down in the hole around the outside of the cellar walls. The dirt is mostly clay and sticks to my boots like crazy. I wore my muck boots since they can be cleaned off fairly easily.

After finishing the outside walls, I changed shoes and began on the inside. I was able to parge one inside wall, an end one. I hope to finish the other three walls tomorrow.

first inside wall pargedI mixed the surface bonding cement in a wheel barrow today, using a garden hoe. It worked fairly well. Previously, I mixed it half a bag at a time in a five-gallon bucket using a paddle mixer with an electric drill. That method actually worked better, but my mixer needs repaired. So, I didn’t use it today.

The key is getting the right amount of water in the mix. If it’s too wet, it’ll slump off of the wall. If it’s too dry, it takes a lot more effort to trowel it on the wall. When it’s mixed just right, it trowels on smoothly and stays where it’s supposed to. It’s been a trial-and-error process getting the mix figured out.

Surface bonded concrete block walls look nice, I think. Better than regular, mortared block walls. It’ll be nice to see them all complete. At that point, I’ll start backfilling.   muddy boots

Tuesday, May 5, 2009

Mixing concrete & filling voids

It’s been raining a fair bit since last Thursday, making work on the house more difficult. I was able to finish stacking all of the blocks (490 of them) before the rains settled in.

Today, we had a break from the rain, but more is forecast for tomorrow along with the possibility of rain every day for the rest of the week. So, I took the opportunity to continue working on the root cellar. The project for today was to fill some of the voids in the block walls with concrete.

In all I mixed 22 bags of concrete mix (80# each) and filled 12 cavities. Each one has a length of 5/8” rebar embedded in it the full height of the wall. At the bottoms of most of the filled cavities, there is 18” of rebar that is embedded in the footer. At the top of each fill, I’m placing a 1/2” j-bolt/concrete anchor with which to bolt on a wood sill. I will mill the sill out of cedar, and it will be 4-1/2” thick – this brings the height of the wall even with the bottom of the first floor girts.

Today’s work went well. The biggest problem is the mud. This is some sticky mud because of all the clay in the soil where I’m working. I wore muck boots and didn’t worry about the mud mess.

With more rain forecast for tomorrow, I don’t know if I’ll be able to get back to the project for a couple of days. I still have the surface bonding cement to trowel on to the walls which I’ll start as soon as I can.

Wednesday, April 29, 2009

Dry stack concrete block construction

While doing some research about laying blocks in anticipation of building our root cellar, I came across drystacked.com and thenatualhome.com. I also found a U.S. Dept. of Agriculture bulletin entitled Construction with Surface Bonding. This information convinced me to use this method.

Today, I had opportunity to actually experience dry stacking concrete blocks. Having set the first course in mortar on the foundation yesterday, making sure it was level, allowed me to get a lot of blocks put into place. As I stacked each block today, I checked it for level along and across the wall. corners stackedOften, when it was out of level across the block, just turning the block around brought it back in the bubble.

I started on the corners, stacking the four corners to five blocks. Then, I set blocks belunch timetween the corners until I had the walls built up to five courses by lunch time. Some of the last blocks on a side took a little persuasion to get to slide in, but they all went.

I’m building my root cellar walls ten courses high. By the time I stopped today, I had two walls at ten courses, one long wall at seven courses, and the other short wall ten courses at one corner and eight at the other corner.

quitting time

Along the wall near the house, I applied the surface bonding cement (Quikrete Quikwall) on the outside of the blocks. I won’t be able to get behind this wall to do surface bonding cementit later. So, after laying the first four courses, I leaned over and troweled it on. After laying three courses, I added more above what I’d put on before lunch. Based upon how this bit went on, I think surfacing the rest of the walls shouldn’t be too difficult.

Dry stacking the blocks was simple enough that even Jessica helped. She came to see what I was doing this afternoon and wanted to help. I showed her how to check level on each block and how to put them on the wall. She worked for a while and set several blocks.

Tuesday, April 28, 2009

Root cellar: starting to block the walls

Another post on the root cellar? Well, that’s the part I’m working on until I get it far enough to work on the next thing.

The floor turned out nice. I took the plastic and tarp off of it Monday. The plastic kept moisture on the surface while it was curing. This was good since I don’t have a hose near the site I could’ve used to mist it. I’m pleased with how the floor turned out. It’s smooth enough to be easily swept.

Last week I ordered and paid for enough concrete blocks, mortar mix, surface bonding cement, and concrete mix to complete the root cellar and crawlspace perimeter (if I figured correctly). 5 cubes of blocks stacked in the root cellarYesterday afternoon the first load was delivered which included six cubes of blocks (90 blocks per cube) and most of the bags of mixes. The rest of my order is scheduled to be delivered next Monday.

Dad helped me stack five cubes on the root cellar floor after they were unloaded from the truck. That was 450 blocks – approximately 16,200 pounds worth that we moved. We were able to set up a ramp down which we slid the blocks one at a time into the root cellar.

Today, I began the root cellar walls. I’m dry-stacking the blocks. This methods involves setting the first course of blocks in mortar onfirst course the foundation, no mortar between blocks. Then, the blocks are stacked without mortar in succeeding courses. Once they are stacked, some of the cores are filled with concrete and rebar for additional strength, after which both surfaces of the walls are coated with surface bonding cement. This makes a strong, durable wall. It’s also a little easier for the novice builder who isn’t a mason.

By the time I finished this evening, I had the first course set. first course mortared into placeIt is important for this course to be level – that’s the main reason for the mortar, actually. After I double-checked my measurements, I laid out the blocks for the first course. I checked for square and that everything lined up. Then, I began to move the blocks again, mix mortar, and set them, checking and double-checking for level in every direction. Tomorrow, if the weather is nice enough, I’ll begin dry stacking blocks on top of the first course. In all there will be ten courses. I may mortar after the fifth course just to ensure things are level, but I’ll hold off on that if it’s not necessary.

 019