Introduction

The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.
Showing posts with label ceiling. Show all posts
Showing posts with label ceiling. Show all posts

Friday, July 27, 2012

Mud on the walls in the upstairs bedrooms

When we finished plastering the kitchen walls, the only thing left to do downstairs was the pantry.004 We decided to save it until after we finished the first coat upstairs. I mixed up a batch of plaster and got the boys busy putting it on the walls while I worked around the windows.

I was thinking of putting boards above the windows upstairs because of their location. It turned out that I could plaster above the windows on the ends upstairs, though. 008So, I had to take down the support boards I had under the bales and put up chicken wire. The bales were actually wedged in very well and didn’t move without the boards to support them.

Then, I had to prepare some oak boards for above the windows on the rear of the house upstairs. 007I planed some boards from some trees we had cut and milled about 8 years ago. Then, I edged them, cut lap joints, and cut them to the proper length before nailing them in place. They turned out really nice and finish 011out the windows well.

 

001

Plaster, studs in the kitchen, & underlayment

Last week we were able to get back to plastering the interior walls full time. We finished the small section in the master bathroom that needed done and moved on to the upstairs walls in the center, open part of the house. We also plastered the wall and around the window in on the landing upstairs.

002003004006

Another project was to install 2x2 framing on the kitchen walls. I’m going to build in the cabinets and wanted a smooth surface against which to build them. We’re also going to have tile backsplash above the counter and below the upper cabinets. There needs to be something to attach the cabinets to, also. I’m going to put up green board (moisture-resistant drywall) on the kitchen walls. The straw bale walls will be plastered behind the drywall to make sure they are well sealed.

So, once I finished the studding, we plastered the kitchen walls with the first coat. Around the windows and the door, the plaster will be shaped to meld with the surfae of the drywall.

009012

One other project we completed last week was to put down 1/2 inch plywood underlayment upstairs. We have hard wood (oak, maple, and hickory) boards for a subfloor 008upstairs which also makes the ceiling downstairs. The underlayment will provide a more even surface for installing the finished hardwood floor on later. It will also serve to keep some of the dirt and mess from plastering from sifting through the cracks. Actually, we’ve already had a fair bit of dirt work its way through the cracks and fall from the ceiling downstairs. So, before we could put the underlayment down, we had to clean out as much of the dirt as we could. We used the air compressor with an air nozzle and a vacuum to get as much as we could. We also put down red rosin paper before the plywood. We’ll have another layer of the rosin paper under the finished hardwood.

Saturday, September 3, 2011

Ceilings

As I took lumber that’s been stacked in the barn for the last five years to have it milled into flooring and began to see how much (or little) I actually had, I began to think about one of my plans. I’ve been planning on putting up a wood ceiling in the kitchen, mudroom, laundry room, and Robert’s room (the room that was going to be the sewing room/study but which we redesigned to be a guest room – Robert is a friend for whom it is currently intended). But, as I saw my supply of wood diminish, and knowing that I have need for more dry 036boards for base board, moldings, cabinets, doors, etc., I felt a need to explore other options.

I finally decided to put up drywall ceilings in these areas. I will paint them with the same clay paint that I will make for the other walls. 042It should make these areas brighter than they would’ve been otherwise, and it preserves my other wood pile near the garage for some of the other needs I anticipate.

So, earlier this week, I brought home enough drywall for the ceilings that needed done. I also bought some moisture resistant green board drywall and insulation for completing the 040root cellar.

I spent time this week putting up ceilings and was able to get them all up by yesterday afternoon. I also had time to begin taping and mudding seams in the kitchen before it was time to quit yesterday. As I like to have it happen, the only waste from the sheets of drywall I bought were small pieces and one piece about 3 feet by 4 feet.

Wednesday, August 3, 2011

“Well, it’s about time!” An update…

It seems like it’s been a long time since I’ve posted to my blog. Probably, because it has been a long time – over 2 months. I’ve not been doing nothing, just not blogging.

I’ve had a lot of different things vying for my time, as is usual for the summer months. Last year I put off a lot of things and worked on the house full time, but I’ve not been able to do that this year. So, I’ve not gotten as much done as I would like.

In this post I’ll try to provide an update on some of the things I have done since the last time I posted (was it really in May?).

We haven’t gotten any more interior walls packed with slip straw. I’d say we have about 65% of them left to do. All of the downstairs windows, 019except the bathroom windows, are bull-nosed now. I have to build the window sills/seats for the kitchen windows and the laundry room windows (and the bathroom windows). 015Then, the five upstairs windows need to be bull-nosed and the window sills installed. I was able to round the bale edges around the front door and on one side of the back door. 018

After purchasing materials to build a masonry chimney, I poured a footer for it. Then, I used concrete blocks to bring the base up to the level of the floor where I’ll be building the chimney. A friend will come over to help me with laying the brick for this project. He’s working on a job that will keep him busy for another week or two, which is fine because I haven’t gotten to the point of being ready to build the chimney yet anyway.

I did begin to plaster the wall behind the location of the chimney. I figured it would be easier to get the plastering done before the chimney is there in the way. 041I’ve only got the first coat on art of the wall so far. I attached some drywall at the top of the bales along this wall (the front wall) to close up a gap between the top course of bales and the beam running across the top of the wall. There was no way to effectively stuff it with straw. I’ll plaster over the drywall pieces later. 038So, they will disappear.

Once I got my hands in the mud, I had to plaster more than just this section of wall. So, I put the first coat of plaster on the slip straw wall in the living room. This wall is between the living room and the master bedroom. After I get the finish coat clay (which I ordered today), I’ll try a batch on this wall to see if it will be enough to finish it, or if I need to put another thin layer on the first coat before the finish coat.

Last week I went ahead and made arrangements for getting two more important jobs done. One of those is installing the cistern, and the other one is having the insulation blown in. I hired a local individual to come dig out the area where we are going to set three 1,500 gallon septic tanks for our cistern. I’ll plumb them together as one tank, and we’ll harvest rain water off of the roof to fill them. I also hope to develop a spring later on for filling the cistern. 046It didn’t take too long to dig into the hill in front of the house where the tanks will be set. I’ll post more on this process later.

Originally, for the insulation above the cathedral ceiling in the house, a friend of mine was going to bring his machine and dense pack cellulose. I took longer than expected in getting things ready for the insulation, and in the meantime he sold his machine. So, I hired an insulation contractor to insulate my roof. They blew in fiberglass in the space I constructed. They also insulated the kitchen, mud room,  laundry room, and guest room (used to be sewing/study) roofs. 042It actually didn’t cost much more than I expected to pay for having my friend do the job.

In preparation for the insulation, I had a few tasks to complete. I blocked in along the front outside wall where there were some gaps into the insulation space. I also blocked in some gaps on the back. I cut the chimney opening in the ceiling and framed it in (I figured it would be easier to do that now than after the insulation was blown in). I also stuffed straw above the kitchen and laundry room windows 052which I hadn’t done previously. I also stuffed straw above the top course of bales to bring the walls up to the ceiling level.

On the day scheduled for the job, yesterday, I removed some metal from the back of the house and cut holes in the sheeting to allow access for blowing in the insulation. It worked great. After they were done, I closed the holes back up and put the metal back on.

Inside, they stapled netting on the ceiling across the rafters and blew the insulation inside that. 048The R-values are 39 for the main ceiling and 28 for the other areas. I think they will effectively be a little higher than that.

There are a lot of things yet to be done before we will move in. One thing I’ve learned through building this house is that my plans and timetables don’t always work out as I imagine they will. I’m okay with that.

Monday, September 13, 2010

The first straw bale walls

The work for today involved finishing the upstairs subfloor (aka the downstairs ceiling), getting things ready to stack some straw bales in a wall, and ceiling in the living roomactually stacking some bales.

While Dad and Jon worked on the floor/ceiling, I hung some 6 mil plastic from the rafters outside the mudroom, laundry room, and sewing room/study.  The plastic is there to keep any possible rain off of the straw bale walls until they’re plastered and/or sided. clay slip making setupI also screened some clay dirt and built a trough to hold clay slip for dipping edges of bales in.

The floor was finished by lunch time, so after lunch we mixed up some clay slip. Clay slip is a very fluid water-clay mixture, basically the thickness of heavy cream. I put water and screened dirt in the concrete mixer and let it mix for a few minutes. It doesn’t take long for clay particles to be suspended in the water.

We put a little of the slip in the trough I made so we Putting clay slip into the troughcould dip the inside and outside edges of the straw bales in it. Dipping the edges of the bales in the slip gets some clay into the outer couple of inches of the bales, providing a little protection from the weather, but most importantly it helps the first coat of plaster to adhere better to the bales than it otherwise would. At least, that’s what I read and decided to try. One method of applying the slip to the bales is to spray it on with aThe corner where we began stacking bales drywall texture gun after the walls are erected. Dipping them eliminates the need for spraying and is probably less messy.

With the slip and trough ready, we put the first bale in the corner of the sewing room/study. We continued on from there until we had stacked the entire wall from the doorway onto the back porch all the way to the doorway out of the mudroom, a little over 50 feet of wall.

Some of the bales weren’t baled as tightly as I would’ve liked, but we worked with what we have. I think they’ll do alright.  Once they’re tied to the framework of the house, a job I intend to get done tomorrow, they’ll be secure. I’ll also fill a few voids in order to get the outside ready for plaster. If I can do that, we’ll start plastering this section on Wednesday.

There were several custom bales that had to be made.  My bale needle worked well for retying bales. With it it is simple to push string through at the desired distance from the end, bring it around, and tie a new bale. The standard bales range in length from 36” (a few are an inch or two shorter, but not many) to about 40”. We selected lengths that fit well, and made our own lengths when needed. There were quite a few reties necessary. Retying takes the most time of any task in the process.

View from the sewing room into laundry room View from mudroom into laundry room

Wednesday, September 8, 2010

Second floor subfloor

upstairs subfloorWe’ve spent several days preparing boards for the upstairs subfloor which is also the ceiling for the first floor. Previously, I bought some cull lumber for this purpose. I stickered the boards after culling out the ones that weren’t usable for the house. That was a few years ago (I can’t remember if it was three or four).

Jon and I ran a few of them through the planer several weeks ago when we had a lull in other construction tasks. Dad and I started planing the rest of the boards last week. We had to run each board through the planer three times, taking off about 3/32” each pass. A few boards were thicker and had to be run through more times. The final thickness was 15/16” with at least one side on each board smooth enough for the ceiling.

The next step in the process was cutting the boards to length. The original lengths were from 8 to 12 feet long. We cut them to 48”, 54”, and 67” lengths. Then, each board could be edged on the table saw before finally have a rabbet cut on each edge so there would be a lap joint when nailed into place.

We determined the necessary lengths of the boards based upon the spacing between the floor joists, wanting the boards to span across at least three joists. For most of them, that is 48”. It’s easier to edge shorter boards on the table saw than longer ones. Also, I’ve left the boards at various widths. boards ready to go to the houseSo, when they are installed, a row is put across which spans at least three floor joists, and then another row is put on.

While Jon and dad began installing the boards we prepared by Monday of this week, I finished cutting the rabbet joints in the remaining boards which had already been cut to length and edged. When I finished, I took them down to the house and checked on their progress. They were doing fine. So, while they worked on the floor, I put flashing on the front corners of the porch roof and installed the ridge cap.

The floor butts up against the cathedral ceiling at the front of the house. junction between the two ceilingsDad cut the edge of the board at 55 degrees to match the angle of the cathedral ceiling. The angle matched, but the boards didn’t line up perfectly because the existing ceiling is not perfect level across its face. That’s okay. I’ll cover this joint with some molding later on.

By the end of the day, we had the floor/ceiling on one side, the landing that will be at the top of the stairs, and the first section on the other side installed. We’ll continue putting the rest in on Friday. Tomorrow, I have to process a few more boards which are already planed (the ones Jon and I planed a few weeks ago). We need some more to finish the job. If I get those ready, we ought to be able to get the rest of the east side done in a few hours on Friday. Then, we might stack a few bales in one section.

   ceiling floor  The ceiling

Wednesday, January 30, 2008

Update: the rest of the ceiling

I have been very negligent in taking care of my blog. It's kind of a slow time of year because of the weather and amount of daylight. These things have affected my work on the house. Also, as the year progressed, the amount of money in the house budget dwindled down to almost nothing. That certainly impacted what I've gotten done.

Prior to Thanksgiving I had as my goal the completion of the cathedral ceiling. I wanted it all on and at least some tar paper on top to keep out some of the water. So, I continued my working of the ceiling boards -- planing, cutting to length, edging, and rabbeting. I was able to get ceiling finished prior to the opening of modern gun season for deer here in my area (November 10th). Here are some photos I took just after finishing it:







Yeah, I could've added some more text. I'll do that on some other items soon. But for now, you can see the pictures.

Monday, October 22, 2007

The cathedral ceiling, part one

For various projects during the last few years, I've purchased bundles of cull lumber from Cub Run Hardwoods in Cub Run, KY. These bundles consist of 600 to 800 board feet of 1 inch thick lumber in various widths that they cull out for various reasons while operating the mill. It's great lumber and a good deal ($100/bundle) for barns and other buildings. Some of the boards are not usable, but usually most of the bundle is nice lumber, maybe with a blemish or a couple of knots. The bundles are made up of whatever species of wood they are milling at the time. Often, there is a mix of woods.

I purchased several bundles last summer and sorted through them, separating the ones that were potentially acceptable for use in the house. One of the uses I had in mind was the cathedral ceiling. After drying about 800 board feet in my greenhouse using a couple of box fans to circulate the air, my dad helped me to plane them to the same thickness (7/8"). We primarily planed only one side (some were thicker and were planed on both sides) since only one side is to be seen -- that inside of the house. We stacked these planed boards on the shed side of my garage where they waited until a little over a week ago.

I cut these boards to 4 foot and 5 foot lengths (they varied in length from 8 to 13 feet). These shorter lengths fit what I need for the ceiling, and they are a lot easier to work with than longer lengths. I set up a 9 foot fence on the table saw and squared the edges, trying to remove as little wood as possible in the process. After squaring the edges, I put a stacked dado head blade in the table saw in order to cut a rabbet on the edges. After about two full days of work, this is what I had:


The boards stacked on my trailer.


Stacked in the frame ready to be tarped.


I alternated the boards to calculate their total square footage.

I had almost half of the boards I need completed. I need to plane more that are dry for the rest of them. That job is waiting for either my new planer knives to arrive or the ones I sent off to be sharpened to return (they were quite dull).

I decided that I would put the boards I had completed on the back section of the ceiling on Friday. I used a framing nailer with 2" nails to attach them to the frame purlins. The boards' length allowed them to span across three purlins. They butt up against one another for each row on the purlins. This worked well since they are of various widths. Here's how it turned out:








There are several different species in this ceiling. As near as I could tell, there is oak, maple, hickory, and locust. The different colors and shades of the wood work well together with their random placement.



This is the view from on top looking toward the west. You can see the joints between the rows of boards. This side of the boards was unplaned except on a few of them.



This is the view off of the other corner toward the east. I thought it was pretty, so I'm sharing it.

It really didn't take long to nail the boards down. Yesterday, I put some 30# felt on the top of the boards to help keep rain water from staining them. I hope to have the front slope of the roof put on within the next two weeks. It'll depend upon when I have sharp knives for the planer.