Introduction

The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.
Showing posts with label siding. Show all posts
Showing posts with label siding. Show all posts

Friday, November 12, 2010

The siding is complete

front of houseWith the blessing of good weather this week, we were able to get the siding all installed. We first completed the walls around the mudroom, laundry room, and sewing room and then began on the walls on the porch on the west side of the house. The process went very smoothly, and we were able to finish Thursday afternoon.

The siding has several different colors, but we’ll be painting it next summer when the weather warms up. There were about 7 different colors in all. I think some of the material was leftover from other projects that was returned to the building supply company. I bought it from a local guy who bought it in auction from the supplier. So, I got a really good deal on it.

northwest cornerfrom a distance

I still have to caulk around the windows and corners, but other than that the house is closed in now. It’s been my goal to have it closed in before Thanksgiving. It’s really quite exciting to meet that goal. I feel very blessed.

Sunday, November 7, 2010

The 2nd floor siding is complete

looking at the house through the trees on the hillside

We were able to finish the siding on the upstairs walls by lunch time today. We were careful throughout the installation process to waste as little material as possible. When I bought it, I quickly calculated that there was enough on this one pallet to do the upstairs walls, but there wasn’t going to be much extra. Apart from scraps of around 12 inches or less, we had four 4-foot sections left over. There were also about two full pieces that were not usable because they were de-laminated.

I think it turned out fine. I’ll clean it sometime later, and I plan on painting it some time. For the time being, it will be fine since it is pre-painted. My plans to paint it are based on the fact that there isn’t enough of one color to do the whole house, and I don’t really want five different colors as a permanent thing.

After we finished the siding, Dad and Danny swept the porch roof off, and we took down the scaffolding and plastic. Since it was all tidied up, it was a good opportunity to take a few photos.

005006004012

Friday, November 5, 2010

Beginning the siding

Before too long, we ought to be able to get the plastic off of the house.

I spent some time on Tuesday fixing the small window that goes above the wood stove. It had a crack in one pane which had allowed some moisture to get between the panes and leave some water deposits. I wasn’t able to purchase I piece of glass locally large enough to replace the one pane, but I had some window glass that was of sufficient size if I could cut it. So, I read about cutting glass and watched a few videos online.

Thankfully, I had more than one piece of glass to work with. I practiced on one and then attempted to cut the real thing. The first one turned out acceptable, although there were a few rough edges. So, I cut another one that turned out a little better. When fixing the window, I ended up using both of the ones that I cut since I couldn’t clean the one remaining pane in the window.

Anyway, it took me most of the morning to get the window repaired and put in the wall.

After finishing the window, I started putting on the flashing where the upstairs walls meet the porch roof. I previously bought a couple rolls of 24” aluminum flashing for this purpose. One of the rolls was long enough to reach from one corner to the other across the back of the house. The other roll was long enough for both ends except for about 5 feet. I had to use some other flashing material there.

On Wednesday, it rained all day. It was just a light, drizzly kind of rain. I put up the tarp on the back of the house upstairs because when the water dripped off of the upper roof, it was splattering on the wall. Since there was no wind with the rain, the other upstairs walls didn’t get wet.

Yesterday, I finished the flashing on one side and started installing the siding. I attached the first piece by myself and then realized that I would need some help to do the rest of them. Twelve foot pieces of Hardiplank siding are west endsomewhat unwieldy. Thankfully, my dad was available to help me in the afternoon.

We worked on the west wall and were able to get the siding to above the window. There was a fair bit of cutting involved to match the roof line and to fit around the window. Also, since I hadn’t initially planned on using this type of siding, I didn’t have the vertical stringers optimally spaced for installing it. That means that there is a little more waste at times in order to make sure that the ends are on one of the stringers so they can be nailed securely.

This morning, even though it was chilly and spit a little bit of rain at times, we were able to get the east wall up to the same height as the west wall. back wallAfter lunch, we worked on the back wall. We didn’t finish it, but we got a good start and should be able to finish it and the other two walls on Sunday.

When I bought the siding, one bundle, enough to do the upstairs based upon my hasty calculations, was a 6 inch exposure while the rest was a 7 inch exposure. I figured that this would work well. If I don’t have enough to finish all of the upstairs walls with the 6 inch, I can finish it off with some of the 7 inch near the top. We didn’t continue above the windows on the either end to ensure we had enough to get the siding up most or all of the way on the back.

Thursday, September 16, 2010

Plaster: the beginning

Plastered straw balesYesterday’s work went very well. Dad, Jon, and I began by tying external pins to the rest of the straw bale wall. With three people, this job went a lot faster than the previous day. Again, pinning the walls really strengthened them by locking the bales together as a single unit rather than individual pieces stacked up.

After finishing the job of pinning, we stuffed voids with loose straw. There were places between bales where you could pretty much reach through the wall. This is is caused by the shape of the bales on the end – they aren’t quite square. You can stuff loose straw in until you get near the edge where it just won’t stay. We mixed up some heavy clay-straw and put in some of the resulting depressions, though.

Rather than continue filling all of the depressions in the wall this way, we decided to go ahead and mix up some plaster. In The Natural Plaster Book Cedar Rose Guelberth and Dan Chiras refer to the first coat of plaster on the bales as the discovery coat. It reveals the topography of the bales, showing the depressions and high places. It’s a thin layer of plaster, about 1/8” to 1/4” thick.

We screened some of the clay dirt I had stockpiled for the plaster using the 1/2” and 1/4” hardware cloth screens I had previously made. In the concrete mixer, we mixed together 5 gallons of clay Messy hands applying plasterwith 3 gallons of sand. Then we added water to achieve a nice consistency (not too wet, not too dry – we figured it out as we went along). The final ingredient was one gallon of chopped straw. We wanted the plaster for the discovery coat to be fairly wet/loose and clay-rich.

Once we had a batch of plaster mixed up, we took it over to the wall and started applying it to the straw bales. I had already trimmed the loose straws with a small electric weed eater/trimmer a few Plastering the first section of wallminutes before. Trimming the bales this way leaves a nice surface for the plaster to be pushed into so that it can adhere well.

We applied the plaster by hand, working it into the ends of the straw on the bales. The intention is for this coat to meld with the straw on the outside edge of the bale so that the plaster will be keyed in very well. Even though the first coat is thin, it is pushed an inch or more into the surface of the bale, intimately bonding it with the ends of the straw.

The first secton of wall after plasteringClay and straw are an ancient building material. Each one benefits the other. The straw helps hold the clay together, providing tensile strength. The clay protects the straw from the damaging effects of water as it absorbs and releases moisture and seals the straw away from the weather. The clay is absorbed by and fills the voids within the straw fibers themselves as the two meld together into a single entity.

We mixed up several batchesDepression in the wall revealed by the discovery coat and worked our way along the wall. We plastered about 20 feet of wall in three hours or so. Later, we’ll apply a second coat which will be thicker and will fill in voids and smooth out the surface. I will probably fill some of the deeper voids before we apply the actual second coat. I’m only planning on two good coats of plaster on the exterior before the siding is put on. The plaster will seal in and protect the bales from the weather, and the siding will be an additional layer of protection in order to keep water off of and out of the bale walls.

Tuesday, August 31, 2010

Straw in the house (and a couple of other things)

We finished unloading and stacking the straw in the house around 7:00 last evening. It was after 8:00 by the time I had my chores done which involves milking two cows. I didn’t take any photos yesterday, but I did take some this morning.

The straw was baled this summer after the wheat was harvested. I bought them from Tyler who lives near Bowling Green, Kentucky. He’s a very nice individual. how things looked 2 months agoHe kept the bales in his barn until I was ready for them here since I didn’t have any place to keep them dry until the house was far enough along to put them in the middle of it. The photo to the right shows how the house looked when I made the deal to purchase the straw from Tyler two months ago. As you can see, there wasn’t anywhere to stack and store bales securely out of the weather.

I bought 300 straw bales four years ago (has it really been that long?) which I stored in the barn. I’m still going to use some of them, but several haven’t survived because of various factors. The cows ate as many as they could get a hold of (they had to really stretch and reach, but they did it anyway). Some were used for animal bedding. Some got wet from a couple small roof leaks. So, I needed some fresh, new bales.

bales stacked in the house

To the left you can see what 300 bales stacked inside the house looks like. It makes it look a lot like a barn! It took about 40 minutes to unload the trailer. The trailer Tyler hauled them on (he delivered them) was a 30 foot monster. I thought we would shuttle the bales about 100 at a time the drivedown the hill to the house with my truck and trailer. But, he was willing to drive it down. It should be mentioned that it is a gravel driveway on a fairly steep hill. The photo to the right is of our driveway going down the hill which was taken last April. It’s hard to appreciate in this picture just how steep it is.

After the weight of the trailer and bales pushed the truck a bit on the gravel at the top, we chained my 4x4 truck to the back of the trailer to provide some extra braking power and made it the rest of the way down just fine. He was then able to drive near the house and back the trailer up to the porch from which point we unloaded and stacked the bales in the house.

Tyler had to wait until he finished work yesterday before he could deliver the bales. He had about an hour to drive, and it was a quarter till 6:00 framed interior wallswhen he got here. So, during the preceding hours, Dad, Jon, and I worked on the house. We framed interior walls for the mudroom, laundry room, and sewing room/study. In two places these walls butt up against the straw bale wall. I also wanted the ones against the timber frame there to help provide structural support for the straw bales going upstairs as in this section there is not a bale wall below them as there is in the other sections.blocking

We also cut an installed some 2x4 blocking along the inside edge of the porch between the vertical stringers. We held the porch floor boards out the thickness of a 2x4 so that we could come back and insert this blocking. It helps to seal up along the bottom of the wall framed by the vertical strings. The starter strip for the siding will nail into this blocking.

Last week, Dad and I planed a few more boards for the upstairs subfloor. These are boards that I bought as cull lumber from a local sawmill and which have been stickered to dry the last two years. We didn’t get the job done because the motor in the planer was having some problems. It’s currently at a shop to be repaired. Once I get it back, we’ll finish planing the boards and then edge them so we can install them in the house. That’s the last major task before stacking bales for the walls.

After finishing our tasks at the house and before the straw bales arrived, I worked on making a bale needle. This will be used to push strings through straw bales in order to retie them to shorter lengths as necessary. It will also be used to push/pull strings through the walls to tie them to framing members. I only need to weld on a handle and do a little polishing, and it should be good to go. I’ll share a photo after it’s finished.

   Bales in the house

As you can see in the photo above, we finished installing the window and door bucks in the house last week. We also added additional vertical stringers as necessary. It’s quite exciting to be almost ready to put up the walls!

Friday, July 30, 2010

Purlins and fascia board

Although I haven’t posted in a few days, I’ve continued working on the house. Jon hasn’t been able to come over to work since last week, but my corner over the root cellardad helped me three days. I’ll be getting more done today.

Dad and I finished the porch on the west side of the house, putting up the two posts and the 4x6 headers. We also got all of the porch rafters up, including the corner over the root cellar and the corner that over what will be the summer kitchen. It’ll just be porch initially. siding on the trailerLater, I’ll close it in for the summer kitchen (might only screen it – we haven’t decided yet).

On Tuesday of this week, I brought home some cement board siding. I have some more to bring home. I’d hoped to get it yesterday, but I had to change two tires on the trailer (one did not make it home intact on Tuesday). purlins on the front porchThe tires are ready to go now, and I’ve unloaded all of the siding from the trailer.

On Wednesday, Dad and I started installing purlins for the porch roof on the front of the house. After we got going on that, we decided to put up fascia board all the way around. I had some 1x6s that worked great for this. We were able to put up all of the fascia board and get the purlins completed on the front and partially done on the east side.

The plan for today is to continue installing purlins so that we can start getting the metal roof on.

 

fascia board 

Tuesday, March 11, 2008

Siding the cupola

My goal for today was to get the siding on the cupola. It took a full day, but I got it done.

The siding I used is wood shingles. I cut them to length from "slab wood" I bought from a pallet company. I bought several pallets of what are basically their culls from making pallets. I worked with two widths (3.75" and 5.75") because that's how they came, and I didn't want to rip them all to other widths.

If I didn't have to work around windows and the slope of the roof, the process would've gone more quickly. The basic idea is to cut the shingles 18" long. Then, staple them on the side leaving 8" showing. This provides a double layer coverage.

This idea worked on the sides of the windows, but not over or above them. There, I had to cut pieces to length so they would fit. On the sides, as you can see, I had to cut the angle of the roof pitch, too.

On the corners, I nailed one inch thick boards for trim. The shingles butt up against these boards on the corners, giving a finished look. I still have to finish the front corners of the cupola with this trim.

The rope tied around the cupola which can be seen in the photo is so I don't slip off the roof while working on the front. I put it around my backside and can lean against it. It allows me to have my hands free to work and provides a level of comfort and safety which I don't want to work without.