The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.

Tuesday, December 16, 2008

This is a house blog

Some people have complained (mainly my sister and brother) that I haven't updated my blog in too long of a time. They are correct, of course. However, this is a blog about my house project. When I work on house-related projects, then I have something to post about. When I don't work on such projects, I don't have something to post about. Sure, I could post some non-related things, but I've refrained from doing so.

Over the summer and into the fall, my attentions were directed in other directions besides the house. We raise a lot of our own food, and this takes time. There were other projects to complete and limited funds to spend on the house. So, there wasn't much progress on the house. I am hoping that this will change as we progress into next year. I've made arrangements that should allow some funds to be made available for the house. My goal is to be able to move in by Thanksgiving 2009. It's an ambitious plan, but we greatly desire to realize it. Arrangements are being made that will free me from some of the food-production responsibilities so that I may devote my time to house building. So, keep your eyes on the blog in the coming months. God willing, there will be a lot of activity and progress on the house in 2009.

Since house-building is not the only thing occupying my time, I have started another blog focused on some of the everyday adventures and activities that are part of our lives here on Cedar Ridge Farm. If you're interested, you can check it out at New Kentucky Homestead. My new blog will allow this one to remain specifically a house blog.

Thursday, April 3, 2008

Just a quick update

Sorry, no photos this time. I just wanted to provide a quick update on what I've been doing the last few days.

Last Friday we made a trip to Lowes to buy some rebar for when we pour the footers and root cellar floor. We also bought some 3" pvc for the drain line from the root cellar. While I was loading the rebar, Anne noticed a "damaged" one-piece tub/shower unit sitting outside that was marked down to $50. It had a small hole in the tub edge and some small cracks in the acrylic of the bottom, both of which I should be able to patch fairly well. So, I offered $25 which was accepted, and we have our second tub/shower unit. We spent less than the price of one for two, because the first one we bought a few months ago was marked down because of slight damage that won't even be visible once it's installed.

Sunday was a nice day since the predicted rain didn't show up. With the backhoe, I dug an 80 foot long trench for the drain line. This is for a floor drain in the cellar. At the end near the cellar, the trench was nearly 8 feet deep. It ended up at 2 feet deep at the other end because of the slope. This provides about 30 inches of drop over the 80 feet. My boys helped glue the 3" thinwall PVC together and put it in the trench. Then, I used the backhoe to fill in the trench.

Yesterday, I dug up a culvert on the drive going to my barn. The one there just wasn't big enough to handle the amount of rain water that washes through there on days like today (it's raining right now). I had some eight foot long 12" concrete culvert sections that I had dug up previously. I was able to put two of them end to end (they have a bell end for connecting them) and one of the 6 inch PVC culverts I dug up back in place. It should help keep the runoff from flooding across the drive.

I also planted 1/2 acre of wheat yesterday afternoon. It was dry enough so that I could disc the field last week, then we received about 1/2 inch of rain. It was dry enough yesterday that I could run the disc over the field one more time. Then, using my hand-powered broadcast seeder, I spread 100 pounds of hard red spring wheat over the ground. Then, I ran a friends cultipacker over it to help push in into the ground a little. With the rain we're getting today and will get tomorrow, it should be sprouting soon!

Today, I've been calculating the number of concrete blocks I need to acquire to complete the foundation walls and root cellar walls. I have 238 blocks I've already collected. I need another 750 or so. I'll also need to order six yards of concrete for the footers and floor once I have everything ready. That'll be after it dries out a bit. It's spring and is still wet here.

Friday, March 28, 2008

Digging it!

I've had a new experience this week: operating a backhoe. You see those big machines at different places and think it would be cool to run one. It can't be that hard, right? Well, I got my chance.

Contemplating digging a 10 feet by 20 feet (roughly) hole five or six feet deep with a shovel moved me to seek an alternate approach to the digging, preferably one that was mechanical and high-powered. I thought about renting a small backhoe. In hindsight, that would not have been a good idea -- the rental charge is $160 a day, and I would've needed it for several days, if it could even have done the job (too small). I thought about hiring someone to do it. I even called a guy about doing so, but he's a busy man. I called another friend who owns a backhoe to ask if his brother would be interested in my hiring him. That didn't work out, but the next best thing did: he agreed to let me borrow and use his backhoe.

So, last weekend, I drove 18 miles to his weekend home where he keeps the backhoe to get the keys. I was making arrangements to have another guy haul it here. Those arrangements were taking too long (I didn't want to waste the good weather early in the week). So, Monday morning my dad and I drove to the backhoe, and I drove it the 18 miles home with dad following. Even with stopping for fuel in town, it only took about an hour.

With the machine here, I started on the work that needed done Monday. The first thing was to figure out the controls. I dug up a couple old concrete culverts which I intend to reuse elsewhere (they are crammed full of dirt at the moment). Then, I began to move some of the top soil which had been pushed off of the house site nearly five years ago. This gave me opportunity to become familiar with operating this big machine. I used the hoe to loosen the dirt in part of the pile so that I could drive the backhoe around to the back of the house where I needed to cut back the hillside and dig the planned root cellar. With it loosened, I could scoop it up with the bucket and move it out of the way. It took a little bit to not only learn the controls but to also figure out how to manipulate them efficiently to obtain the ends I desired.

Once I moved some of this topsoil out of the way, I began on the hillside at the back of the house. It was actually quite easy to break up and move as it was basically just topsoil also. I tried to cut it back and taper the slope so there will be plenty of room for the porch at the back of the house plus a bit extra. I don't want a steep slope there, but on one end it will be because of how the slope lies -- it's higher at one end of the house than the other. This work would've been done earlier if I had anticipated changing the plan to include a rear porch. Change has been an integral part of our project, and that's actually been a good thing, because we are happy with our plans and the changes we've made.

Digging the root cellar took more than two days. It would've gone faster but for two things: hydraulic leaks and the need to keep moving the dirt. An older backhoe like this one (a Ford 555) will invariably have its issues and leaks. That's okay. However, one of the flex lines feeding the main cylinder for lifting the boom ruptured and drained out most of the hydraulic fluid. So, I took it off and had a new one made.

The next significant leak occurred on a hard line running to the cylinder which moves the shovel on the hoe. I tried tightening it and polishing the compression fitting, but it gradually got worse. It was still usable, but I stopped using it yesterday when a steady stream was spraying out of the connection. I took it to Glasgow (Kentucky, not Scotland) and had a replacement made today. I'll put it on and continue working this weekend. I wouldn't feel right about returning the machine not working as it should, and since he's lent it to me, I want to return it in better condition than I got it. it's still a whole lot cheaper than renting one or hiring the work done.

The other aspect that's slowed down progress on the root cellar is the need to stop digging and move the dirt every little while. There isn't room near the hole being dug to put it all. I also won't need it all for backfill. So, I've used the excess to fill a ditch that had washed out and which has been here on the property since before we bought the place. I've also put a lot of it in front of the house. This will be used to make the slope in front of the house more gradual. I also had to make sure access for pouring the concrete for the block wall footers and the root cellar floor wasn't blocked. After I build the block wall, I'll hire someone with a bulldozer to come for a day to backfill, fix the front slope, and move the topsoil over it all. Then, I'll be able to proceed on the next part of the housebuilding: the porch.

The whole for the cellar is eleven feet wide and about 23 feet long. I dug it approximately six feet deep so that the ceiling will be at least seven feet high after the floor is poured. It looks deeper because the hill slopes upward to the back. The back of the hole is closer to nine feet deep. I still need to clean it out a little more and then dig a drain line. I'll put a drain in the floor and run the line to daylight. Digging the trench for that will be interesting since I need to maintain a proper slope so it'll drain properly. I'll do that next week.

In the photo above, you can see the hole (I'm standing in it, in case it's hard to tell). You can also see the slope I adjusted behind the house. I need to work on the edges and clean out some of the loose dirt in the bottom. One of the amazing things is that I didn't dig into a rock ledge. There are ledges all over around here. In fact, just above this location on the hill, there is rock at the surface. I dug out a few rocks floating in the dirt, one the size of a desk.

Hopefully, I'll have some more photos later after I finish things up a bit more. The photos in this post are compliments of my dad. I've been otherwise occupied so that I haven't taken pictures this week.

Wednesday, March 19, 2008

Featured write-up on houseblogs.net

Imagine my surprise when I went to the houseblogs.net homepage and saw our house at the top of the page! We were written up for one of their Featured Stories entitled Building a Debt Free House. It's a nice write-up, and I am excited to see it there! Thanks, houseblogs.net!

Friday, March 14, 2008

The digging continues . . .

Yesterday was a beautiful day with temperatures in the mid-70s. So, I had some more shovel work to do.

Before I began on digging for the block wall footer, I had six fruit trees to put in the ground. We ordered several fruit trees from Adams County Nursery along with four other families, because, if you order 25 or more trees, the price per tree is basically cut in half. As it ended up, the price for each tree averaged right at $12. And, these are nice trees, too. We ordered several from them two years ago and will order some more this fall for next spring.

I used the post hole digger to help dig the holes for the fruit trees. While I had the tractor running, I went ahead and dug a series of holes along the east side of the house to help with digging for the footer on that side, as it was to be the next side to be completed. After getting the trees all set, I started digging. In the photo you can see my older son helping out. He and his younger brother have helped with the digging and moving dirt from the trench. The concept of digging is one that they seem to love, but when it comes to it being a form of work, they have a much more difficult time. I had already dug out the trench around the corner at the time I took the picture.

I had several sore muscles from my digging the day before, but I figured the soreness would work itself out as I continued with what needed to be done. So, I dug for several hours. It's a slow process when you have to move tons of dirt a shovel-full at a time, but it does get the job done. By the end of the day, I had completed the east side and along the front of the house. I still have sore muscles today, but that just goes along with such work.

About ten feet from the front of the house, I stepped the depth of trench down eight inches. The house is on a slightly sloping site, and I dug the trench along the back as deep as I reasonably could (about 30 inches or so). I want to keep the footer deep enough along the sides and front, and that requires that I make them at least one block deeper there.

As I've been digging, I've decided against a rubble trench with a drain. The ground here drains very well -- there was no moisture below the first few inches, and we've had enough rain recently that if there was a problem with drainage it should've been apparent. So, I'll just pour a footer along the bottom of the trench to lay the concrete blocks on.

As I contemplate digging the root cellar and terracing the hill behind the house, I'm wishing for a backhoe. I may see about hiring some of this work done. Although it will cost money, it will also save some time and a lot of work.

Wednesday, March 12, 2008

Using a "misery spoon"

I finished the trim on the front of the cupola this morning. That didn't take long. So, I started on the next part of the project: digging a trench around the frame.

It was afternoon before I started digging. I drove to my friend Gill's house this morning to borrow his pto-powered post hole digger. I used it when digging for the pier footings two years ago. With the 12" auger, it helps to loosen the soil, making the digging easier. So, I borrowed it to use it for this part of the foundation.

I started on the back of the house. This will be the deepest trench because there is a slope toward the front. The only problem was that I couldn't get the tractor behind the house to use the auger except on the ends. The hill that rises just behind the house was too steep for me to comfortably maneuver the tractor and auger into position. I had to accept being able to drill three holes on each end.

I worked for about 3 hours with the shovel, a tool that someone once called a "misery spoon" for good reason. I'm sure I'll be sore tomorrow. I expect I'll work out some of the soreness while digging. The trench for the footer that will be under the concrete block wall I'm putting there must go all the way around the house.

The foundation for this will will employ a rubble trench. I'm going to put rock and a perforated pipe for a drain in the bottom of the trench, and then more rock. On top of the rock I will pour a rebar reinforced concrete bond beam six or eight inches thick. Upon this I will lay concrete blocks to the desired height. This concrete wall will help support the straw bale walls and the inner side of the wrap around porch.

In addition to the trench, I'm going to dig for a root cellar. This will be located under the pantry and mudroom. Then, I need to terrace the hill behind the house before I can frame the porch because the hill is in the way. Originally, there wasn't going to be a porch on the back, but there is now, and I've got to move some of that hill. It can be done with a shovel, one scoop at a time.

More digging to do tomorrow, and the next nice day, and the next, and . . .

Tuesday, March 11, 2008

Siding the cupola

My goal for today was to get the siding on the cupola. It took a full day, but I got it done.

The siding I used is wood shingles. I cut them to length from "slab wood" I bought from a pallet company. I bought several pallets of what are basically their culls from making pallets. I worked with two widths (3.75" and 5.75") because that's how they came, and I didn't want to rip them all to other widths.

If I didn't have to work around windows and the slope of the roof, the process would've gone more quickly. The basic idea is to cut the shingles 18" long. Then, staple them on the side leaving 8" showing. This provides a double layer coverage.

This idea worked on the sides of the windows, but not over or above them. There, I had to cut pieces to length so they would fit. On the sides, as you can see, I had to cut the angle of the roof pitch, too.

On the corners, I nailed one inch thick boards for trim. The shingles butt up against these boards on the corners, giving a finished look. I still have to finish the front corners of the cupola with this trim.

The rope tied around the cupola which can be seen in the photo is so I don't slip off the roof while working on the front. I put it around my backside and can lean against it. It allows me to have my hands free to work and provides a level of comfort and safety which I don't want to work without.