Introduction

The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.

Thursday, April 16, 2009

Root cellar: concrete forms in place

Although it was overcast this morning, it didn’t rain today. The sun finally came out from behind the clouds around noon. I worked in the hole all day. This morning the damp clay in and around the work area stuck to my shoes all the time. With the sun out this afternoon, I didn’t have any stick. Either the sunshine dried things just enough or this clay is allergic to sunshine.

I didn’t use the backhoe today. I moved a fair bit of dirt with a shovel and a grape hoe, though, in order to get make sure the bottom of the Salvaged boards for formshole was level. It was close, thankfully. There was some dirt along the edges that needed moved so I could set the forms.

For the forms, I used some boards Danny salvaged from an old mobile home he helped demolish. They are fat 2x4s, measuring about 1-3/4” x 4-1/4”. I had to pull some old staples out of them, and then I was ready to set them in place. I also cut some stakes from some scrap boards I had near the house.

I started in one corner and leveled the forms from there. One end formed by lunch timeBy lunch time I had one end and over half of both of the long sides done. Since it’s important to put the outside corner of the root cellar walls in the right place, I had to take some measurements from the west side of the house. Determining the precise location of this corner is somewhat difficult. However, using a ladder strapped to the floor joists in the house, I was able to measure eleven feet out from that side of the house and set a stake at the inside corner of the root cellar.

To figure the outside corner, I measured from the stakes I had set previously. It soon became apparent that I didn’t have things laid out square. It was time for lunch at that point, so I left it till this afternoon. Armed with an exact measure of the hypotenuse of a right triangle with two eleven foot sides and a framing square, I adjusted one of the corners on the forms I had already set. Once I did that, the diagonal measurements came out correct – things were square.

It didn’t take long this afternoon to finish the forms. I built a small box to go around the floor drain. I’m not sure exactly what the usual way is for pouring a floor with a drain. I figure that I can pour everything around and up to the form around the drain with enough slope for water that ends up on the floor to head for the drain. Later, I’ll cut the drain pipe at the right level, mix and pour some concrete, and fill the last section of the floor around it.

Forms in place

The next step is to dig a couple inches deeper near the forms for the footer and lay out some rebar in the footers and floor. I don’t think that will take too long. Once that’s done, we can have the ready mix truck come out. The only thing that may interrupt the timing of things is rain. If we get too much rain, I’ll have to wait for things to dry out before the concrete truck can get close enough to the hole. I hope the weather cooperates so we can pour the concrete next Tuesday or Wednesday.

Root cellar: second excavation

On Monday I had a neighbor haul a friend’s backhoe to our place. This is the same backhoe I used a year ago to excavate the root cellar. Since I didn’t get the floor poured and walls built last summer, the winter rains washed a lot of dirt and debris into the hole. I started shoveling it out by hand, but found the task daunting. The backhoe has saved a lot of time.

I was able to move clay-dirt from one pile near the hole on Monday, but then it began to rain. I didn’t work with the backhoe on Tuesday, but yesterday I was able to get at it. It was a little muddy on top still, but I wanted to get the job done.

Today, I plan on finishing with a shovel, moving the dirt left in the hole out of the way. Then, I will begin building the forms for the concrete. If the weather cooperates, we’ll pour and finish the floor next week.

Tuesday, April 14, 2009

Milling porch posts (part 2 with video)

Sunday of this week was a nice day. Dad and I had already milled 15 6x6 posts for the porch, and I decided to get the rest of them milled. Last week I 3 new Oregon saw chains from from Treestuff.com (3/8” pitch, .058 gauge, 115 drive links). They shipped them out right away and I received them on Friday. These were regular cross cut chains with a 25 degree angle on the teeth. Sunday morning I ground the first one to 20 degrees with a 50 degree hook angle. Generally, ripping chains are ground to either 0 degrees or 10 degrees. I wanted to try it at 20. It worked fine. I’ll probably try the next one at 10 degrees so I can compare it to this one.

I purchased a new video camera (Canon FS100) for creating a video documentary of the house-building process from this point forward. Using the sawmill provided an opportunity to use it. My dad shot this video of me finishing one of the posts.

I’ll probably share occasional videos on the blog. The editing process for the documentary of the project will happen later.

After milling on Sunday, we now have 22 posts ready for the porch.

cedar 6x6s cedar 6x6s cedar 6x6s

I still have some more cedar logs to mill, but I’ve not decided yet what dimension lumber/beams would be most desirable at this point. I’ll also need to haul some beech logs from Gill’s place and mill them. I think the milling will be put on hold for the next three weeks at least, though. I’m hoping to get the root cellar floor poured and the walls blocked and then to get a perimeter of concrete blocks laid around the timber frame. These will enclose the crawl space and help support the porch and straw bale walls.

Monday, April 6, 2009

Milling porch posts

Last week while we had some nice weather, we started milling some of the cedar logs into porch posts. The posts are 6x6s. Sure, 4x4s would’ve worked, but six inch posts will look better.

My dad helped me move and set up my Procut Mobile Sawmill. I hadn’t used it for several months. I did use the saw (a Husqvarna 3120XP) for cutting down several beech trees at a friend’s place. We’ll be skidding out the logs from those trees in the next few weeks if it dries up a bit. Those will be milled into beams and lumber for the porch, at least that’s the plan.

millingMilling the porch posts went well. It’s not a speedy process with my chainsaw mill, but I wasn’t out to set any records anyway. Things proceeded well, though. We cut 15 posts after getting the mill and everything ready. We also had to change chains on the saw after the first one broke. I have three chains, but they’re all about worn out, having been sharpened about as much as is desirable.

millingbroken chain
slab pile and remaining logsposts in truck

As you can see in the photo of completed posts, some still have bark and rounded corners. I’ve judged this to be fine. I’ll shave the bark off, and the rounded corners will work and look fine. On some of the posts, the rounded corners occur on the end which will be cut off when the posts are cut to length. We also cut a few 2x4s from some logs that weren’t quite large enough to make 6x6s.

With good weather in the coming weeks, we’ll get the rest of the posts milled. We’ll also have to haul beech logs home and mill them into the desired sizes. That may be before or after work on the root cellar and porch foundation work.

(A special thanks to my dad for providing the photos for this post.)

Plaster samples

Two weeks ago, my dad and I worked on some gardening tasks. We had nice weather and the ground dried enough for it to be worked. Gardening tasks are important, and it’s that time of year. My dad has agreed to do a lot of the gardening work in order to free my time for working on the house.

Right now getting the root cellar floor poured and the blocks laid for the walls is what’s standing in the way of significant visual progress on the house. As I’ve been down in the root cellar hole shoveling out dirt that’s washed back in with the rain, I’ve wished greatly that I would’ve been able to have done the concrete and block work last summer. It would’ve saved time right now. I cleaned out about half the washed in dirt a few weeks ago, but you wouldn’t know it now. It actually seems like it’s worse than it was before. I shoveled out a bit last week, but it was frustrating because it was wet and kept sticking to my shovel.

However, as it stuck to my shovel and I complained to no one in particular, it occurred to me that this might actually be a good thing. Why is this dirt sticking so badly? That is one of the properties of clay – it’s sticky. As I continued to grow in height while working in the hole (I had a couple inches of the mucky goo stuck to the bottom of my boots), I became more excited about the possibility that I might be mucking around in the plaster for my straw bale walls.

With this in mind, I collected two samples: one from the bottom of the root cellar hole and another from a pile near the cellar that was excavated from it last spring. I put these samples in jars, added water (and a little salt), stratified soil sampleshook them vigorously, and left the contents to settle. With this process the larger aggregates and sand settle first, then the silt, and finally the clay (adding salt can help speed up the settling of the clay which can take a long time). Once everything settles, you can determine the relative percentages of the different materials in the soil.

It seems like there is a lot of clay in my samples, so much, in fact, that I cannot clearly determine the lines of demarcation between the different strata. When working with the dirt in my hands, there are clearly some small rocks (aggregate) mixed in, but nothing too bad.

The next thing to do was to try making some sample batches of plaster with this dirt. I brought some up the hill along with a hay bale from the barn. I cut the bale in half with my chainsaw so that I would have twice the surface area to try out my samples of plaster on. Then, I mixed two batches of plaster using dirt from the pile near the cellar.

For the first batch, I mixed on part dirt, one part washed masonry sand, and one part chopped strawchopped straw (not pressed into the measure, just loose). I plastered a section of the side of the first half bale with this mix. Then, I mixed the second sample using on part dirt, two parts sand, and one part chopped straw. My younguns helped me put this plaster on another part of the same surface as the first plaster.

The plaster actually felt good, and we enjoyed putting it on the bale. The second batch felt a bit sandier, of course. Both went on nicely. They’re not dry yet, though. So, I haven’t determined for sure their suitability for the walls in the house.

plaster samples on bale

The weather’s a bit cool, so it’ll take a little while for them to dry completely. At that point, I’ll see how well the samples adhered to the bales and check them for other desirable qualities. In the following photos, you can see the texture of the samples and the chopped straw in the plaster. The one on the left is the first batch (one-to-one mix) and the one on the right is the second batch (one-to-two dirt/clay ratio).

first samplesecond sample

It will be really neat if we are able to plaster our walls with dirt harvested from our building site. Previously, I figured that I would buy bags of pottery clay for the walls. This new possible method will save some money and will just be better in many other ways. Even so, in order to get the desired wall color inside our home, the final coat on the walls will probably use kaolin clay bought from the pottery supply store.

 

Friday, February 20, 2009

More cedar logs

Dad and I cut and skidded another 21 logs out of the woods earlier this week. I should only need a few more. Currently, I'm in North Carolina my family visiting relatives. All four of Anne's sisters and brothers live in or near North Carolina (two live in SC near Charlotte, NC). After we return home early next week, there's more to do on the house projects. I'm anxious to get things done, but for a lot of it I've got to wait on the ground to dry a bit and the weather to be nice. Having a few spring-like days recently has really helped.

More to come, so stay tuned . . . .

Thursday, February 12, 2009

Skidding cedar logs (future porch posts)

Because it was another nice day here in South-Central Kentucky, I skidded the cedar logs I cut earlier in the week out of the woods. My dad helped, which I appreciate a lot. Feb    12th 013We started with three logs which were far up the hill. I actually had cut these trees last winter. They’d blown down in a storm previously. I had limbed them and left them long, 16 to 20 feet.

Even though they were at the top not far from the old county road, it was easier to skid them out from the bottom of the hill. I can drive the tractor in a couple of hundred feet which was at the bottom bellow the trees. They were still over 100 feet up the hill. Feb    12th 015We used a couple of ropes to reach them and pull them down the hill. They pulled out fine, meaning they didn’t get caught up on stuff and needs extra coaxing. For one, we had to use a snatch block to redirect the direction of pull. I have a couple blocks that are part of the two block and tackle sets I bought prior to the frame raising.

After lunch, we skidded out the five cedar logs I had bucked into 9 foot lengths earlier in the week. These didn’t lay too far from the bottom of the hill, and we were able to physically pull them to the bottom where we could get a choke chain around them and pull them out of the woods. This went much more quickly than snaking logs down from the top of the hill.

Feb    12th 011Feb    12th 017 

We skidded the logs and laid them out where I’ll mill them into 6x6 posts with my Procut Mobile Sawmill later. I had two cedars Feb    12th 021I cut several years ago which we also skidded to the pile. Each of these was long enough to make two posts. So, in the pile, we now have enough cedars for 17 of the 20 posts.

We then went in search of another cedar tree that might yield three more posts and which would be easily accessible. We have many cedars on the property, some of them very nicely sized. We didn’t find one that was tall enough for three posts where we looked on the other side of the ridge, but there are several that would yield two posts.

I cut one down, having picked where I wanted it to fall and where I thought it would naturally go. However, it didn’t go where I thought it would. It was evident while making the back cut that it was beginning to lean the opposite direction. I guess I read it wrong, but it sure didn’t look like it would fall that way. Feb    12th 025It ended up falling about 90 degrees from where I planned for it. This was fine, except for how cedars so easily get hung up in other trees. This one did, leaving it leaning at about a 35 degree angle.

I limbed what I could off of it and then measured and cut the lower nine feet off for a post. This allowed the tree to settle down a bit more. So, I was able to limb the next section and cut it off. I’ll pull the rest of the top out later after skidding the logs. It was getting near chore time, and we still needed to put the tractor and tools away. So, we called it quits. I’ll cut another tree for the 20th post and skid them out of the woods later. (I wasn’t wearing my chainsaw helmet because I hadn’t brought it. I had the chainsaw just in case it was needed when skidding, not expecting to do any real sawing.)

089 085