Introduction

The 57 acres that comprise Cedar Ridge Farm are located in the beautiful rolling hills of South Central Kentucky. My wife, our four children, and I are on a homesteading adventure as we work toward increased self-sufficiency. We grow much of our own food and enjoy being in touch with the agrarian roots of our lives.

One of the major projects we have undertaken is the building of our own home. The house we're building has three major distinguishing features: 1. we're building it without incurring any debt; 2. it is a timber frame structure; and 3. the exterior walls will be plastered straw bales. We live debt and mortgage free, and building our house with that approach makes perfect sense. Large timbers in a home possess a beauty and project a sense of strength, stability, and warmth that we want in our home. Straw bale walls provide insulation and make ecological sense. This blog is a record of our home-building project.

Tuesday, February 10, 2009

The root cellar and some porch posts

Yesterday morning, I shoveled some more dirt out of the root cellar. It’s getting much closer to being ready to form the footers for the block walls. I still have a bit more dirt to remove, but I didn’t go back to it today. I have some sore muscles, including my right shoulder which I strained throwing some firewood a week ago. In the photos below, you can see the current state of the cellar hole. I have to take some proper measurements and lay out where the footers need to be. To this point, I’ve just taken some quick measurements to figure out approximately where to excavate to.

005 001

Yesterday afternoon, rather than excavate more, I headed out with my Stihl MS250 to fell a few cedar trees. The trees I selected will be milled into 6x6 porch posts. I need 20 posts all together. I spent a little time with Google Sketchup the other day laying out the CRF house -- porch posts 01spacing for my porch posts. They don’t fit exactly on eight foot centers. So, I needed to determine where they should be in order to have them as close to that spacing as possible. On the front and back, they’ll be on 8’ 1-1/2” centers. On the sides, they’ll on 7’ 10” centers. Close enough to eight feet to work, I believe.

The first tree I cut yesterday was one near the house site that had lost its top in the recent ice storm (at least I think that’s when – I hadn’t noticed it before Sunday). I walked up on a nearby hillside and felled three more trees.

Today, I limbed the downed trees and bucked them into nine foot lengths. With a couple of trees I already had down, I have enough for 12 posts already. They all need skidded out of the woods and to the location in which I’ll mill them. I should be able to do that within the next couple of weeks if the weather permits. I’ll need to select a few others, but having over half of them already down is good.

Sunday, February 8, 2009

Video documentary of this project?

I’ve been toying with the idea of creating a documentary about our house project. In building our house, we’re doing something that is special for us, and we’re learning a lot in so doing. Quite a few months ago, I purchased Ted Owens DVD documenting the building of his hybrid home (Building With Awareness). This is a great resource – very interesting and very well done. I’ve really appreciated the information included on the DVD, and I continue to refer to it. I’ve not purchased the guidebook that goes along with the DVD, but I imagine it’s quite good too.

Early last week I received two more DVDs that I ordered from Andrew Morrison at StrawBale.com. The two I received are “Building with straw bales (post and beam infill)” and “Plastering with natural hydraulic lime (NHL).” Andrew has a lot of resources available to help individuals interested in building with straw bales.

Recently, my wife Anne and I watched a documentary on Youtube about a family’s attempt to develop a homestead and live off of the grid. I don’t remember the name of it, but we cringed and shook our heads a few times at some of the things they were trying to do and how they were going about it. Not quite how we would have approached similar problems.

Anyway, it would have been great if I had had and implemented my idea of creating a video documentary of our house-building project from the beginning. However, as we’re entering into the phase of the project after the timber framing portion, there is still a lot to be accomplished. I’m just a regular guy tackling a big and innovative project. I would like to be able to share some of the things I learn and how I approach some of the challenges and problems that are part of it.

If you think there might be some interest in such a documentary, let me know. I’m seriously thinking of doing it even if there isn’t much interest, motivated by many of the same desires that have led me to this blogging endeavor. At the very least, such a documentary would be neat for my family to have in the future.

Planning

One of the things I’ve been doing a lot of recently is planning for the building tasks to be undertaken this year. I really want to accomplish a lot, and I’m trying to determine what needs done and in what order. There are several details to be ironed out, and I’m trying to anticipate as many as possible.

One of the things I have recently modified is the exterior walls around the mudroom, pantry, and utility room area. I was thinking about framing these walls conventionally with the straw bale wall going to wrap around the timber frame on the interior wall of these rooms. I’ve decided at this point that it makes more sense to put the straw bale on the exterior here, instead.

crf house -- floorplan

This change will have a couple of benefits. One is that the rooms in this space will be better insulated from outside. For the pantry, this is perhaps most important as I don’t plan on having any heat in that corner of the house. It will be nice if it would stay fairly consistent temperature-wise throughout the year. The second benefit is that it will remove bathroom plumbing away from the straw bale wall. That was the primary motivating factor in my considering changing our plan in this area of the house.

The major threat to the health and longevity of a straw bale wall is moisture. I’ve already tried to plan on keeping outside moisture out and away from the bales via plaster on the bales, an air gap, and then wood siding on the outside edge of the bale walls. Inside, I will have to take extra care in areas of higher humidity. In the second bathroom, I’ll probably use a lime plaster instead of the clay-based plaster I plan for most of the walls. I’ll probably also use a lime-based finish plaster on the bale walls in the kitchen area.

Other planning that I’ve been doing includes porch framing and the external framing for the siding and windows. The porch will have 6x6 cedar posts on roughly eight foot centers. I say roughly because it varies by about two inches more or less on each side because of the dimensions of the house. The exterior frame work will consist of 2x4s  oriented flat with the bales and 2x6 window frames (oriented opposite of the 2x4s but with their outside edge flush with the same plane). I have not completely decided whether the 2x4s will be on 24” centers or 32” centers. It depends on whether I use 1x4 stringers or go ahead and sheet the exterior with OSB.

When it is time to lay the bales, I will have the porch and exterior framing in place and the porch framed and roofed. I will install the upstairs straw bales first so that they can be plastered and sided before the downstairs bales are installed. This is important as the upstairs bales will be exposed to the weather without the protection of the porch roof. Also, until the upstairs exterior walls are completed, the porch roof cannot be completely flashed. That would mean that the downstairs bales would be subject to moisture damage from any rain that might occur. I don’t want that to happen, of course.

Another change that has resulted from recent planning involves the interior walls of the house. Originally, I was going to use real wood paneling on them. Recently, we’ve decided to plaster the interior walls too. I will use some sort of lath, whether metal plaster lath or woven bamboo (the sunshades that are available for purchase), to hold the plaster. This will provide a brighter interior. I don’t want to use drywall, although it is possible to plaster over a drywall surface. I just don’t want a conventionally finished drywall wall.

Planning some of these details is exciting. I’m feeling very motivated to get on with the project. I want to move in as soon as possible. Actually, I wanted to be able to move in a few years ago, but I expect that the wait will yield a better finished product.

Digging out the cellar a second time

I should have completed the work on the root cellar last spring or summer, but other things interrupted my plans to do so – things like growing food and making hay. All was well until a couple of months ago after we received a couple of inches of rain in a short while. 095The amount of rain accelerated the erosion process around the perimeter of the excavation. I expected some of this to happen, but it was more than I wanted to see. Much of the back wall sloughed off into the cellar hole.

Today was a nice 70 degree winter day with pleasant sunshine and a gentle breeze (actually, not much like winter, but we get this days sometimes). So, I spent a couple hours working in the cellar, beginning the process of excavating the extra dirt. I’ll probably have a few sore muscles tomorrow, but even so I plan to continue with the process. I’d like to get it done so that I can proceed to the other tasks associated with completing the cellar. 094The first one of those after excavating will be forming and pouring a footer for the block wall.

I began today’s work by driving some boards into the sloughed off dirt, hoping they will help hold it and keep more from falling into the hole. I drove them down to the original bottom of excavation and am placing boards horizontally behind them. Then, I began shoveling dirt out, working from one corner across the back. The vertical edge of dirt I’m leaving ought to work as the back side of the form I’ll build for the footer. I’ll have to arrange something to keep more dirt from falling into the area I’ve excavated.

I’ve thought a lot about how to complete the cellar. My plan right now is to dig out the extra, unwanted dirt. Then, I’ll build a form for a footer under the block wall I’ll lay. I’ll mix concrete by hand for the footer. Once it’s set, I’ll lay the block wall. My idea is that once the wall is up, I’ll have the local ready mix company bring out enough concrete to pour the floor (leveled off from the edges of the footer) and to fill several of the voids in the block wall along the back of the cellar. This will will experience most of the stress of all the walls, and I would like it to be reinforced.

Once it is warm enough and the ground is dry enough to allow a concrete truck down the hill and next to the house, I hope to have everything done so that the cellar can be finished.

Thursday, January 22, 2009

Video of the frame raising

I just put together a video of our frame raising, or parts of it anyway. This video uses digital still photos that my parents took. They used a continuous function on their camera that made it possible to create an animation rather than a regular slide show. I have a time-lapse video of the raising that I would like to share, too, but it's still in VHS format (I used an old video camera). I'll see about getting it converted to digital format and sharing it before too many more moons pass.


Tuesday, December 16, 2008

This is a house blog

Some people have complained (mainly my sister and brother) that I haven't updated my blog in too long of a time. They are correct, of course. However, this is a blog about my house project. When I work on house-related projects, then I have something to post about. When I don't work on such projects, I don't have something to post about. Sure, I could post some non-related things, but I've refrained from doing so.

Over the summer and into the fall, my attentions were directed in other directions besides the house. We raise a lot of our own food, and this takes time. There were other projects to complete and limited funds to spend on the house. So, there wasn't much progress on the house. I am hoping that this will change as we progress into next year. I've made arrangements that should allow some funds to be made available for the house. My goal is to be able to move in by Thanksgiving 2009. It's an ambitious plan, but we greatly desire to realize it. Arrangements are being made that will free me from some of the food-production responsibilities so that I may devote my time to house building. So, keep your eyes on the blog in the coming months. God willing, there will be a lot of activity and progress on the house in 2009.

Since house-building is not the only thing occupying my time, I have started another blog focused on some of the everyday adventures and activities that are part of our lives here on Cedar Ridge Farm. If you're interested, you can check it out at New Kentucky Homestead. My new blog will allow this one to remain specifically a house blog.

Thursday, April 3, 2008

Just a quick update

Sorry, no photos this time. I just wanted to provide a quick update on what I've been doing the last few days.

Last Friday we made a trip to Lowes to buy some rebar for when we pour the footers and root cellar floor. We also bought some 3" pvc for the drain line from the root cellar. While I was loading the rebar, Anne noticed a "damaged" one-piece tub/shower unit sitting outside that was marked down to $50. It had a small hole in the tub edge and some small cracks in the acrylic of the bottom, both of which I should be able to patch fairly well. So, I offered $25 which was accepted, and we have our second tub/shower unit. We spent less than the price of one for two, because the first one we bought a few months ago was marked down because of slight damage that won't even be visible once it's installed.

Sunday was a nice day since the predicted rain didn't show up. With the backhoe, I dug an 80 foot long trench for the drain line. This is for a floor drain in the cellar. At the end near the cellar, the trench was nearly 8 feet deep. It ended up at 2 feet deep at the other end because of the slope. This provides about 30 inches of drop over the 80 feet. My boys helped glue the 3" thinwall PVC together and put it in the trench. Then, I used the backhoe to fill in the trench.

Yesterday, I dug up a culvert on the drive going to my barn. The one there just wasn't big enough to handle the amount of rain water that washes through there on days like today (it's raining right now). I had some eight foot long 12" concrete culvert sections that I had dug up previously. I was able to put two of them end to end (they have a bell end for connecting them) and one of the 6 inch PVC culverts I dug up back in place. It should help keep the runoff from flooding across the drive.

I also planted 1/2 acre of wheat yesterday afternoon. It was dry enough so that I could disc the field last week, then we received about 1/2 inch of rain. It was dry enough yesterday that I could run the disc over the field one more time. Then, using my hand-powered broadcast seeder, I spread 100 pounds of hard red spring wheat over the ground. Then, I ran a friends cultipacker over it to help push in into the ground a little. With the rain we're getting today and will get tomorrow, it should be sprouting soon!

Today, I've been calculating the number of concrete blocks I need to acquire to complete the foundation walls and root cellar walls. I have 238 blocks I've already collected. I need another 750 or so. I'll also need to order six yards of concrete for the footers and floor once I have everything ready. That'll be after it dries out a bit. It's spring and is still wet here.