Yesterday I was able to finishing plastering the surface bonding cement on the blocks around the house. So, this morning I began grading the dirt around the house. My objectives were to push at least some of the dirt up to the walls and to level off the top of the hill in front of the house.
Last spring when I dug the cellar, I piled the extra dirt from the excavation in front of the house in order to extend the level of the ground outwards. Eventually, I will have the hill extended further out so that it will slope more gradually toward the garden. For now, I needed to level it off a bit in preparation for building the porch.
Using a grader blade with my tractor, I was able to pull dirt from the middle of the pile in front of the house toward either end and up to the block wall. I pushed the piles of dirt from excavating for the footers on the east side of the house toward the wall and toward the front of the house. In the back, I moved dirt toward the wall and around to the east side of the house. There’s still a bit that needs moved with a shovel, but it’s mostly graded. I wasn’t able to get the tractor and blade on the west side of the house. So, I’ll be moving the dirt on that side with a shovel later.
With the dirt graded around the house, I’ll measure and set some stakes and string for framing the porch. I have to pour footers that go under the porch posts, and I need them to be correctly placed.
3 comments:
I think you're doing a great job. You're doing SBC just like I am. If you want check out my project and my friend jeffs on this website.
http://countryplans.com/smf/index.php?topic=5386.420
Darryl,
Where are you these days? How is the house coming along?
Hey, Wade! I'm still around, just haven't posted any updates. I've got to do so -- hopefully a couple of posts in the next week or so. Thanks for checking on me!
Post a Comment